Existing geometry
Measure the real building, openings, circulation, ceiling heights, and structural conditions.
Attached ADU planning
Attached ADUs depend heavily on the existing home: wall locations, foundation, roof, utilities, windows, structure, circulation, and fire/life-safety conditions. ADU.zone therefore treats attached layouts as property-specific design work instead of publishing a misleading fixed-plan catalog.
Property-specific layout
Measure the real building, openings, circulation, ceiling heights, and structural conditions.
Confirm electrical, sewer, water, HVAC, and service-upgrade implications before design is locked.
Review fire separation, egress, energy, structural, parking, and jurisdiction-specific requirements.
Bedrooms, baths, storage, accessibility, privacy, and rental goals shape the final layout.
Planning sequence
01
Start with parcel context, existing improvements, and the information that can be verified online.
02
Survey, utilities, structure, access, hazards, and local requirements are resolved before the scope is treated as final.
03
Develop architecture and engineering around the verified site, then submit through the applicable agency process.
Next step