The parts of a complete budget
A complete planning budget usually includes the following layers. Not every project uses every line, but leaving one out is how early numbers fall short.
Design, engineering, and energy documentation
Architecture or design-build drawings, structural and, when required, civil engineering, Title 24 energy documentation, and CalGreen or local submittal items are soft costs. Pre-approved or City-listed pre-reviewed plans can reduce review time and some revision cost. They do not eliminate site, utility, or foundation work. See the City’s preapproved ADU information and the San Jose pre-approved ADUs page.
Construction (the “hard costs”)
Foundation, framing, enclosure, interior finishes, kitchen and bath, electrical, plumbing, and mechanical work make up most of a new detached unit’s cost. Conversions reuse some of the existing shell, but they can still require insulation, waterproofing, egress, and utility upgrades. Finish level is a large swing factor. Garage conversions and a junior ADU conversion are different scopes from a new detached building.
Site work, utilities, and access
Grading, drainage, retaining, demolition, driveway or path work, sewer or water extensions, electrical-service or panel upgrades, and difficult access can exceed the box cost of a small unit. Fire access and hydrant flow can trigger added measures. See the City ADU FAQs, accessed 9 November 2026.
Permits, plan review, and agency fees
Building, plan-review, fire, and public-works fees are only one layer. Other charges can include geological review, tree removal, fire variance, construction taxes, and school or parkland fees when they apply. Use the City’s own estimator. This page does not guess a permit total.
Contingency and owner selections
Appliances, upgraded finishes, landscaping, solar or electrification scope, furniture, and a contingency line for unknowns should be listed separately so a low construction number is not mistaken for a turnkey total.