Statewide rules (Government Code)
The JADU ordinance rules are in Article 3 of Chapter 13, starting at section 66333. The HCD Accessory Dwelling Unit Handbook (March 2026) explains the same rules. Accessed 9 November 2026.
City ordinances and state statutes both matter, and they change. The notes below are a reading guide, not a legal opinion. Verify the current San José ordinance and the current state text with the City, and consult a professional before you treat any sentence here as the rule.
Size and location (inside the primary dwelling)
Published descriptions generally place a JADU inside the single-family house. JADUs are limited to 500 sq ft of interior livable space under state law (Gov. Code § 66313(d)); confirm how San Jose measures it. An attached garage is sometimes treated as part of that house. A detached structure often is not. Confirm the location with the City, and consult a professional before design.
One JADU per single-family lot
Section 66333(a) limits a local JADU ordinance to one junior accessory dwelling unit per residential lot zoned for single-family residences with a single-family residence built, or proposed to be built, on the lot. HCD’s handbook adds that if there are multiple detached single-family units on one lot, there can still be only one JADU, and that a half-plex on its own lot can have a JADU, while two units attached on a single lot are treated as multifamily and would not qualify. Those half-plex and duplex examples come from the HCD handbook, not from a San José determination.
Separate entrance and efficiency kitchen
Section 66333(e)(1) requires a separate entrance from the main entrance to the proposed or existing single-family residence. If the JADU does not include a separate bathroom, section 66333(e)(2) also requires an interior entry to the main living area. Section 66333(f) requires an efficiency kitchen, which must include a cooking facility with appliances and a food preparation counter and storage cabinets of reasonable size in relation to the JADU. HCD’s handbook states that a local agency cannot be more restrictive than this definition, and that a 220V circuit is not required for an efficiency kitchen.
Bathrooms and owner occupancy
Owner occupancy for a JADU is easy to oversimplify. Some published explanations connect it to a shared bathroom, and older handouts say the owner must always live on site. Those statements are not a determination for a San Jose property. Verify the current San José JADU ordinance and Universal Checklist with the City, and consult a professional.
Deed restriction and no separate sale
San José’s ADU Service submittal checklist includes Form 313, a JADU deed-restriction agreement. Whether a JADU can be sold separately is something to verify with the City and a qualified professional. This page does not say that a separate sale is available.
Rentals longer than 30 days
Section 66333(g) requires that a rental of a JADU be for a term longer than 30 days. The City of San José ADU FAQ states the same 30-day minimum for ADU rentals, including short-stay platforms, and reminds owners of fair-housing rules (accessed 9 November 2026).
Parking, ministerial review, and utilities
- Parking: section 66334(a) says a JADU ordinance shall not require additional parking as a condition of the permit. HCD notes this remains true even when a JADU converts an attached garage.
- Ministerial review: section 66335 requires permit applications under this article to be considered ministerially, without discretionary review or a hearing, and sets completeness-notice timing, including a 15 business-day completeness determination in the current text.
- Unrelated violations: section 66336 limits denial based on some unrelated zoning or unpermitted-structure issues unless they present a threat to health and safety. Read the full current text before quoting the exceptions.
- Not a separate dwelling for some codes: section 66337 treats a JADU as not a separate dwelling for certain fire and life-safety purposes. Section 66338 treats it as not a separate dwelling for water, sewer, and power service and connection fees. These are technical. Do not over-claim them.
- No local ordinance: section 66339 requires ministerial approval of a compliant JADU when the local agency has not adopted its own ordinance, as further developed in later “.5” sections. That last point needs expert review.