Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.FAQAnswers about cost, permits, licensing, and steel framing.ContactReach the ADU California Inc. team.
(650) 400-7606Check my property
(650) 400-7606

Planning guide

How long an ADU takes in California

There is no statewide duration for an ADU, and ADU California Inc. does not publish one. The calendar is the sum of the property, the drawings, the city’s review, the utilities, and the inspections. A framing benefit, including a statutory review clock, does not replace verification, engineering, permitting, or inspections.

Use the ranges below as drivers, not a promise. Verify the path with your city before you treat any week-count as a schedule.

What actually moves the calendar

  • Whether the address is inside the city you think it is, and which checklist that city uses.
  • How complete the first submittal is. Missing surveys, utility letters, or structural sheets restart review.
  • Site work that is not the building: access, slope, fire separation, sewer capacity, and a new meter.
  • Whether a home already stands on the lot. State law treats a concurrent new house differently from an ADU beside an existing home.
  • Coastal review, a recorded restriction, or a correction letter. Each one adds its own clock.

The sequence, without a fixed length

Property check and scope

The first useful step is the address. Parcel records, zoning, and utility maps can arrive quickly when the sources respond, or sit incomplete when a lot line, easement, or sewer question is missing. That gap is part of the schedule. It is not a permit decision.

Design and engineering

Floor plan, structure, energy, and the utility route have to agree before a city will treat the set as reviewable. A flat lot with a catalog footprint is a shorter drawing effort than a hillside lot, a two-story unit, or a garage whose slab and ceiling still need to be measured. The drawings are not the permit.

City review

For a lot that already has a single-family or multifamily dwelling, Government Code section 66317 requires the permitting agency to approve or deny an application to create or serve an ADU within 60 days of receiving a completed application. If the agency does not approve or deny that completed application within 60 days, the statute says the application shall be deemed approved. The same section says the 60 days is tolled when the applicant asks for a delay, and that an ADU submitted with a new house can wait until the agency acts on the new house. HCD’s March 2026 handbook also describes a written completeness check, generally within 15 business days, and a separate coastal-development clock. Read section 66317 and the HCD handbook. Verify with your city. ADU California Inc. does not issue the city’s permit, and a complete application is not approval by itself.

Construction and inspections

After a permit is issued, the field sequence is foundation, frame, enclosure, utilities, interiors, and the inspections the permit lists. Weather, a utility trench, a correction, or a material lead time changes the weeks. The company does not publish a construction duration that applies to every lot.

What this page does not do

A shorter review clock, a steel frame, or a preapproved plan does not replace a survey, engineering, the city’s permit, or the inspections. If two city pages disagree, the address still needs a planner. Related reading: how the process is organized, property value and taxes, San Jose ADU cost, junior ADUs, and San Jose. Verify with your city.

Sources

Reviewed November 9, 2026. State pages are amended. Confirm the section that applies, then verify with your city.

  • California Government Code § 66317 — ADU application timelines
  • HCD Accessory Dwelling Unit Handbook, March 2026
  • California HCD accessory dwelling unit page

Start with the address, or talk it through.

A property check is preliminary. A consult is a conversation, not a permit, a price, or an appraisal.

Book a consult (650) 400-7606

Let’s build your ADU

Your property.
Your next chapter.

Explore the possibilities for your California property.

Check my property
Architectural concept of a modern California ADU in a landscaped garden, shown in natural daylight
Design concept

Let’s talk about your project.

(650) 400-7606info@adu.zone

ADU CALIFORNIA INC

San Jose office

84 W Santa Clara St, Suite 700
San Jose, CA 95113

Open 24/7

(650) 400-7606Get directions

Walnut Creek office

1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596

Open 24/7

(650) 400-7606Get directions
ADU CALIFORNIA INC
  • Facebook
  • Visit us on Industry Oversight
FAQCalifornia ADU costKnowledge Center
Legal & disclosuresPrivacyTerms of useAccessibility
CSLB #1163442

© 2026 ADU CALIFORNIA INC. All rights reserved.

San Jose · Walnut Creek · California