One current scope
Selections, exclusions, assumptions, and changes should be recorded—not left in scattered conversations.
How it works
The work is complex. Your view of it should not be. Each stage has a purpose, a concrete output, and a decision before the project moves forward.
Before stage 1
An address and a basic project goal are enough to begin. The property check provides value before asking you to commit to a design or sales call.
Or compare models firstThe full cycle
Can the site support an ADU?

We begin with the address, available parcel records, preliminary local rules, visible structures, site geometry, and the items that still need professional verification.
What you should receive
What should the ADU become?

Choose a model direction, layout priorities, finish level, accessibility needs, and project goals. The concept is adapted to the property rather than copied blindly.
What you should receive
How will it perform as a building?

Architecture, structure, foundation, energy, utilities, and applicable technical requirements are coordinated into a project-specific document set.
What you should receive
What must be resolved before construction?

The project team submits the coordinated package, tracks agency comments, responds to corrections, and keeps the current review status visible without treating submission as approval.
What you should receive
Is the project ready for assembly?

Current framing information, identified members, utilities, access, demolition, grading, foundation work, and required inspections are coordinated around the actual site.
What you should receive
How does the project become a finished home?

The project moves through foundation, framing, enclosure, utilities, interiors, inspections, corrections, commissioning, and final handoff.
What you should receive
Good project management makes uncertainty visible instead of hiding it behind a simple progress bar.
Selections, exclusions, assumptions, and changes should be recorded—not left in scattered conversations.
Preliminary information stays labeled until the responsible source, agency, or professional confirms it.
Late design changes can affect engineering, manufacturing, permits, cost, and schedule.
There is no honest universal timeline. Jurisdiction, site work, utilities, reviews, and change volume all matter.