800 sq ft
Up to 800 sq ft is exempt from the lot’s MDA/MFA calculation under the Town’s published guidance.

Los Altos Hills, California
Custom ADU design, architecture, engineering, permits and construction for Los Altos Hills—planned around hillside conditions, MDA/MFA, access, utilities and the property itself.
800 sq ft
Up to 800 sq ft is exempt from the lot’s MDA/MFA calculation under the Town’s published guidance.
30% slope
The Town identifies slopes over 30% as a placement constraint for a new ADU.
Heritage oak
A new ADU cannot be placed within a Heritage Oak critical root zone under the published standards.
Shared driveway
The Town calls for ADU access to use the same driveway as the primary residence.
These are selected planning checkpoints, not a parcel determination. Confirm current standards with the Town for the specific address.
Los Altos Hills feasibility
Large lots can still carry difficult constraints. Screen the buildable area before paying to develop a design that may need major revision.
Town ADU requirementsThe first 800 sq ft receives special treatment; additional area needs a property-specific MDA/MFA check.
The Town publishes a 40-ft front setback, 4-ft side/rear baseline and additional options tied to larger setbacks and parking.
Screen creekbank proximity and recorded easements before fixing the footprint.
Hazard conditions can trigger professional geotechnical or geologic review.
Parking exceptions can apply, but driveway strategy remains a local design issue.
Los Altos Hills reach-code guidance applies all-electric requirements to newly constructed detached ADUs.
Design + permits + construction

01
Site-responsive floor plans for hillside, large-lot and estate properties.

02
Permit-ready architectural coordination around the home, site and objective local standards.

03
Structural, foundation, geotechnical, civil and utility coordination as the property requires.

04
Construction planning, procurement, inspections, site logistics and closeout.

05
A coordinated path from property feasibility through design, permits and construction.

06
One project workflow connecting planning, professional disciplines and field execution.
ADU models for Los Altos Hills
These are planning footprints and design directions—not pre-approved Los Altos Hills projects. Every property still needs site-specific review.

600 sq ft · 1 bed · 1 bath
A compact guest house or independent living suite with a restrained footprint.
View model
850 sq ft · 2 bed · 2 bath
A warm contemporary layout for multigenerational living or a premium guest residence.
View model
1,000 sq ft · 2 bed · 2 bath
A full-size backyard residence for sites that can support the added area and review.
View modelCabinetry & built-in interiors
For Los Altos Hills ADUs, interior storage and millwork should feel integrated with the architecture—not added at the end. ADU California Inc. coordinates kitchen cabinets, bathroom vanities and closet systems through our partnership with Ronbow as part of the interior finish-planning process.
Product availability, dimensions, finishes and lead times are confirmed for the specific project before ordering.

Kitchen cabinet layouts, integrated appliance planning, storage optimization and Ronbow finish coordination.

Vanity sizing, storage, mirrors, lighting coordination and Ronbow finish selections for a cohesive bath package.

Built-in closet and wardrobe storage solutions coordinated with the project’s interior design.
Interior partner
Ronbow kitchen cabinets, bathroom vanities & closet systems
Permit roadmap
01
Screen parcel records, MDA/MFA, slope, trees, creek/easement conditions, utilities and access.
02
Choose the footprint, layout direction and architectural character that fit the site.
03
Coordinate structural, geotechnical, civil, energy and utility disciplines as required.
04
Submit the permit package, manage comments and document revisions through approval.
05
Coordinate procurement, field work, inspections, closeout and final handoff.

Los Altos Hills pricing is highly site-specific. Foundation strategy, slope, geotechnical scope, utilities, access, glazing, finishes and professional services can materially change the budget. The Town’s updated Community Development fee schedule took effect August 1, 2026, and agency charges can depend on scope and staff time.
Review the Town fee scheduleSome Los Altos Hills properties use onsite wastewater systems, with County Environmental Health handling septic permitting. New detached ADUs also need to account for the Town’s all-electric reach-code requirements.
Searches this page answers
The Town allows an 800-sq-ft baseline path and publishes larger size options subject to MDA/MFA, bedroom count, setbacks, parking and other standards. Confirm the parcel-specific maximum before design.
The Town publishes a 40-ft front setback and 4-ft side/rear baseline for new ADUs, with other standards and options depending on the project.
Potential geotechnical or seismic hazard conditions can trigger professional review. Use the pre-application process to identify what the parcel requires.
Septic feasibility and permitting are handled through Santa Clara County Environmental Health. Confirm wastewater capacity before treating a concept as buildable.
The Town’s reach-code page states that newly constructed detached ADUs are subject to all-electric building requirements.
The Town’s published ADU guidance calls for using the same driveway as the primary residence. Discuss unusual access conditions with Planning before designing around a separate drive.
Start with the property