Call
ADU California Inc. house iconADU California Inc.Steel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.FAQAnswers about cost, permits, licensing, and steel framing.ContactReach the ADU California Inc. team.
(650) 400-7606Check my property
(650) 400-7606
  1. Home
  2. /
  3. Guides
  4. /
  5. ADU cost in California

Planning ranges, not a bid

ADU Cost in California (2026): Published Data and Planning Ranges

This page collects independent published job-cost data for a defined 660 sq ft ADU project, then shows ADU CALIFORNIA INC steel-frame planning ranges generated from the same model data used on our models pages. Nothing here is a quote, a kit price, or a guaranteed total.

ADU CALIFORNIA INC · 84 W Santa Clara St, Suite 700, San Jose, CA 95113 · (650) 400-7606 · CSLB #1163442

Independent published data

Table A. JLC / Zonda 2025 Cost vs. Value

Project definition: Build a 26'x30' (660-sq.-ft.), one-story accessory dwelling unit. The source project uses conventional 2×4 construction on a structural slab. These are modeled job costs for that defined project, not ADU California Inc. prices.

Published job costs from JLC / Zonda 2025 Cost vs. Value, with a source link on each row.
SourceMarketProject definitionJob cost
JLC / Zonda 2025 Cost vs. ValueSan Francisco26′×30′ (660 sq ft) one-story ADU$203,481
JLC / Zonda 2025 Cost vs. ValueLos Angeles26′×30′ (660 sq ft) one-story ADU$178,536
JLC / Zonda 2025 Cost vs. ValueSacramento26′×30′ (660 sq ft) one-story ADU$168,400
JLC / Zonda 2025 Cost vs. ValuePacific region average26′×30′ (660 sq ft) one-story ADU$181,004
JLC / Zonda 2025 Cost vs. ValueNational average26′×30′ (660 sq ft) one-story ADU$166,406

Modeled construction job cost for a defined project; excludes land, and may not include all permit, utility or site costs. Retrieved November 2026.

ADU California Inc. planning ranges

Table B. Steel-frame model planning ranges

These figures are generated from the same model data used on the models pages and the home page. They are planning ranges, not a kit price and not a contract. Use the cost calculator to start a preliminary range for a specific set of assumptions.

Planning ranges for current steel-frame models with a defined footprint.
Model footprintLayoutPlanning range
20×20 (400 sq ft)Studio, 1 bath$197,500 – $264,000
20×30 (600 sq ft)1 bed, 1 bath$302,500 – $405,500
25×30 (750 sq ft)2 beds, 1 bath$384,000 – $515,500
25×34 (850 sq ft)2 beds, 2 baths$449,500 – $602,000
25×40 (1,000 sq ft)2 beds, 2 baths$523,000 – $702,000
30×40 (1,200 sq ft)3 beds, 2 baths$630,500 – $846,000

Standard finishes + steel framing. Baseline allowances included; site-specific work and utility upgrades may add cost. Preliminary, not a quote.

Why the two tables are not the same number

Table A is an independent modeled job cost for a defined 660 sq ft one-story ADU built with conventional 2×4 construction. Table B is ADU CALIFORNIA INC planning ranges for steel-framed models with a defined scope. Those planning ranges include standard finishes and steel framing, with baseline allowances; site work, utilities, design, engineering, and permitting can add cost, as the model disclaimer already states. The two tables measure different scopes, so one should not be read as a correction of the other. Neither table is a bid.

State fee and review rules

Under California law, an ADU with 750 square feet or less of interior livable space is exempt from impact fees from local agencies, special districts and water corporations; larger ADUs are charged proportionately to the primary dwelling (Gov. Code § 66311.5).

A permitting agency must approve or deny a complete ADU application within 60 days when there is an existing dwelling on the lot (Gov. Code § 66317).

Source: HCD ADU Handbook, March 2026. Confirm the current section with your city before you budget or file. San Jose fee rules and budget drivers are in the San Jose ADU cost guide.

Cost questions

How much does an ADU cost in California?

Independent published data for a modeled 660 sq ft one-story ADU (JLC / Zonda 2025 Cost vs. Value) lists job costs of $203,481 in San Francisco, $178,536 in Los Angeles, $168,400 in Sacramento, $181,004 for the Pacific region average, and $166,406 for the national average. Those figures are modeled construction job costs for a defined project; they exclude land and may not include all permit, utility, or site costs. ADU California Inc. also publishes steel-frame planning ranges by model footprint, generated from the same model data used on the models pages. Those ranges are preliminary, not a bid or contract price, and site-specific work and utility upgrades may add cost.

Are there impact fees on a 750 sq ft ADU?

Under California law, an ADU with 750 square feet or less of interior livable space is exempt from impact fees from local agencies, special districts and water corporations; larger ADUs are charged proportionately to the primary dwelling (Gov. Code § 66311.5). Confirm the current treatment with the city, any special district, and a qualified professional before you budget. Building permit fees still apply.

How long does approval take?

A permitting agency must approve or deny a complete ADU application within 60 days when there is an existing dwelling on the lot (Gov. Code § 66317). Corrections, incomplete applications, agency workload, and coastal or other additional reviews can extend the schedule. This is a state timing rule, not a construction schedule or a guaranteed completion date.

Is the calculator a quote?

No. The cost calculator provides an early planning range, not a bid or contract price. Final cost depends on model size, design changes, finishes, utilities, access, grading, demolition, jurisdiction, and site conditions, and must be confirmed in a written, property-specific proposal.

Sources

Job-cost figures were retrieved November 2026 from the linked JLC / Zonda 2025 Cost vs. Value pages. State rules are from the HCD handbook and the Government Code sections it cites. Confirm the current source before you make a construction decision.

  • JLC Cost vs. Value — accessory dwelling unit project definition
  • JLC / Zonda 2025 Cost vs. Value — San Francisco
  • JLC / Zonda 2025 Cost vs. Value — Los Angeles
  • JLC / Zonda 2025 Cost vs. Value — Sacramento
  • HCD ADU Handbook, March 2026
  • California Government Code § 66311.5
  • California Government Code § 66317

Turn a planning range into a property-specific conversation.

The calculator is a preliminary range, not a quote. A consult is a conversation, not a permit, a price, or a construction schedule.

Open the cost calculator (650) 400-7606

Let’s build your ADU

Your property.
Your next chapter.

Explore the possibilities for your California property.

Check my property
Architectural concept of a modern California ADU in a landscaped garden, shown in natural daylight
Design concept

Let’s talk about your project.

(650) 400-7606info@adu.zone

ADU CALIFORNIA INC

San Jose office

84 W Santa Clara St, Suite 700
San Jose, CA 95113

Open 24/7

(650) 400-7606Get directions

Walnut Creek office

1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596

Open 24/7

(650) 400-7606Get directions
ADU CALIFORNIA INC
  • Facebook
  • Visit us on Industry Oversight
FAQCalifornia ADU costKnowledge Center
Legal & disclosuresPrivacyTerms of useAccessibility
CSLB #1163442

© 2026 ADU CALIFORNIA INC. All rights reserved.

San Jose · Walnut Creek · California