- What size ADU does Cupertino allow?
- The City’s ADU page and development-standards page say living area of 800 square feet or less is not limited by lot coverage, floor-area ratio, or open space, while a larger ADU is. The same ADU page says a studio or one-bedroom unit is limited to 850 square feet and an ADU with two or more bedrooms is limited to 1,000 square feet on a single-family property. A JADU is described as 500 square feet or less. Decks are excluded from the living-area measurement the City uses for the 800-square-foot exemption. These are published standards, not a determination that a specific Cupertino lot can hold that floor area.
- How close can a Cupertino ADU be to the side and rear property lines?
- The ADU page and the development-standards page say an ADU of 800 square feet or less may be located as close as 4 feet from the rear and side property lines. The information sheet says the front setback follows the underlying zoning, and that a detached ADU must be at least 5 feet from the main house measured eave to eave. On a corner lot, that sheet modifies the street-side setback to 4 feet and says the ADU may not enter the required corner triangle. Walls less than 5 feet from a property line are limited by the sheet to obscured glass or a sill more than 5 feet above the floor. A larger detached ADU must meet the accessory-structure ordinance. Confirm the zoning setback for the address before placing a building.
- Can I build a two-story ADU in Cupertino?
- Cupertino’s own pages do not give one answer. The ADU page says a two-story ADU is allowed when it converts existing second-story space. The Planning FAQ says a two-story ADU is allowed on most single-family property and tells you to ask Planning whether the lot qualifies. The information sheet, with a standards table updated November 3, 2020, lists a 16-foot height for a detached ADU of 800 square feet or less and says attached height follows the underlying zoning, with 16 feet allowed at the point farthest from the rear and side lines. The current HTML standards page does not publish a different height number. Ask Planning which of these controls the lot before designing a second floor.
- What are the Cupertino rules for a junior ADU?
- On the ADU page and the development-standards page, a JADU is an ADU of 500 square feet or less, contained entirely within an existing or proposed home and not created in a garage, kept within the allowed 45 percent floor-area ratio, and provided with at least an efficiency kitchen. The bathroom may be shared with the main home or be independent. The owner must occupy either the main home or the JADU and record a deed restriction covering sale, size, and JADU attributes. The July 30, 2020 steps handout says the covenant is obtained from Planning, notarized, and recorded with the Santa Clara County Recorder before the final inspection is scheduled. A JADU is not a detached cottage.
- Does a Cupertino garage conversion require replacement parking?
- No. The ADU page, the Planning FAQ, and the development-standards page all say you do not provide replacement parking when a garage is converted to an ADU. The development-standards page also describes when one additional off-street space can be required, and when that requirement drops away: within one-half mile of a public transit stop, in an architecturally and historically significant historic district, where the occupant is not offered a required on-street parking permit, or within one block of a car-share pickup. Those pages also say leftover garage area cannot become living space for the main house. Whether a garage conversion can be paired with another ADU is not consistent across the ADU page and the Planning FAQ, so confirm the combination with Planning.
- Are impact fees waived for a Cupertino ADU under 750 square feet?
- The current ADU page says an ADU under 750 square feet does not pay park, storm drain, and school impact fees, and that a larger ADU does. The Planning FAQ narrows the City waiver to park and storm drain fees and says school impact fees are set by the school district. The July 9, 2021 information sheet says the same about park and storm drain fees and adds that an ADU of any size may owe school impact fees. The City lists Cupertino Union School District at 408.252.3000 extension 61-373. It prints Fremont Union High School District as 408.522.2220 on the information sheet and as 408.522.2200 on the Planning FAQ. Call Public Works at 408.777.3354 and both districts before removing a fee from a budget. A plan of exactly 750 square feet is not described as exempt.
- How long does Cupertino ADU plan review take?
- The Building Permits page lists 10 business days for the first review of a detached or attached ADU and 10 business days for each resubmittal, and it says those targets can change. The same page says that, because of application volume, the current average is 20 to 30 business days for an initial plan review and 10 to 20 business days for each later review. Plan-review fees are due before review starts. The July 30, 2020 steps handout does not publish a guaranteed approval date. Treat both numbers as City scheduling guidance, not a promise that a complete application will be approved on a particular day.
- Who serves water, sewer, and electricity for a Cupertino ADU?
- The City utilities page says water is California Water Service in the area it maps in purple, at 650.917.0152, and San Jose Water in the area it maps in green, at 408.279.7900. It says the northwest portion of that green area is operated by San Jose Water under a lease of City-owned water infrastructure. Sewer is Cupertino Sanitary District at 408.253.7071 or Sunnyvale Sanitary at 408.730.7400, depending on the map. Gas and electric service are listed as Pacific Gas and Electric at 877.660.6789, with Silicon Valley Clean Energy at 844.474.7823. The ADU page says to ask the water provider and PG&E whether a separate meter is required. The City does not decide that on the ADU page.
- Do Cupertino pre-approved plans skip site review?
- No. The pre-approved plans page says the program is for detached ADUs and that every pre-approved plan is still subject to site concerns. Applications are limited to the Valley Floor Zone, which the City defines as relatively level valley floor outside fault-rupture, slope-instability, hillside, and liquefaction or inundation categories. A homeowner package still includes the master-plan set, a boundary survey, and a site plan. The City lists vendor designs, including a 476-square-foot one-bedroom plan from J. Kretschmer Architect. Those listed plans are not projects built by ADU California Inc. A parcel outside the Valley Floor Zone uses the regular permit path.
- Can I sell a Cupertino ADU separately from the main house?
- The ADU page and the Planning FAQ both say an ADU may be rented and may not be sold separately from the main home. Both also say ADUs, including JADUs, may not be used for short-term rental. A detached ADU is required to have its own address. Other ADU types may have an address but are not required to. The County Assessor appraises new construction, including an ADU, and the City points readers to the Santa Clara County Assessor for the tax effect. None of this is a rental-income forecast or a statement that a particular Cupertino property can be rented.