El Dorado County · California
Cameron Park owners need the County’s location- and construction-type-specific fee guidance. Its fee resources distinguish Cameron Park CSD from El Dorado Hills and separate manufactured from site-built examples.
Local planning guide · Reviewed October 2, 2026
Permitting authority: El Dorado County — unincorporated Cameron Park
Official local guidance| Topic | Local guidance |
|---|---|
| County jurisdiction | Use El Dorado County Planning and Building for the unincorporated property. |
| Construction type | Identify manufactured or site-built scope before selecting a County checklist or fee example. |
| Site approvals | The County notes that ADU projects may still need fire, solar and septic requirements addressed. |
Selected local requirements, not a complete zoning determination. Confirm the current rules for your address with the responsible agency.
The County identifies Cameron Park CSD in Zone B fee examples and publishes a separate Zone B mobile-home ADU estimate. These are scope-specific examples; request current building, planning, district and school assessments for the proposed design.
County Zone B manufactured ADU fee worksheetConfirm the fee zone and serving districts, establish the construction type, and use the County ADU checklist. Coordinate outside-agency payments separately where the County’s issuance instructions require them.
Municipal fee example
The County’s main fee page labels its Cameron Park CSD example separately from the EDH CSD example. Its typical-house illustration should not be reused as an ADU quote.
View the original sourceLocal sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California to confirm project availability; this guide does not establish an office location or property approval.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces. They do not assert that a particular scope is permitted or suitable for your address.
Compare planning footprints
These model pages are planning references only. They are not a statement that a particular size is allowed or buildable at a Cameron Park address.
California directory
The next useful action
The online review is preliminary and is not a permit decision, survey, engineering opinion, construction document, final price, or guaranteed schedule.