ADU Design Danville
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Contra Costa County · California

Danville pairs its ADU ordinance with an outside-agency checklist and an online permit portal. Its advertised Accelerator rebate had a September 30, 2026 end date, so a new budget should not assume that funding remains available.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Local planning guide · Reviewed October 2, 2026
Permitting authority: Town of Danville — ADUs
Official local guidance| Topic | Local guidance |
|---|---|
| Rental term | The Town’s guidance requires ADU and JADU rental terms longer than 30 days. |
| Drawing changes | Changes to an existing design should go back to its architect and engineer of record. |
| Agency coordination | Use the Town’s outside-agency checklist to identify approvals beyond the building permit. |
Selected local requirements, not a complete zoning determination.
Request current permit charges from the Town Permit Center. The published Accelerator program period ended September 30, 2026, or earlier if exhausted. Do not deduct a rebate without written confirmation of an applicable reservation or extension.
Danville Accelerator program dates and conditionsCompile the Town’s building submittal requirements, plot plan and applicable outside-agency materials, then apply through Danville’s CSS portal. Keep any rebate reservation and occupancy deadlines separate from permit approval.
Historical municipal program
The published program linked rebates to size, affordability restrictions and final occupancy. It is a dated incentive example, not an offer of new funding as of this review.
View the original sourceLocal sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
Design-led ADU planning
Start with ADU design in Danville, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.