Call
ADU California Inc. house iconADU California Inc.Steel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.FAQAnswers about cost, permits, licensing, and steel framing.ContactReach the ADU California Inc. team.
(650) 400-7606Check my property
(650) 400-7606
Home/Cities/Davis

Yolo County · California

Davis ADU design & construction

Illustrative daylight rendering of a backyard ADU. Not a photograph of a completed project in Davis.

Davis sorts ADUs into three tracks in its January 2026 ADU Guidelines: State Exempt ADUs that need only a building permit, Ministerial ADUs held to objective design standards, and Non-Ministerial ADUs of up to 1,200 sq ft and 30 feet that need an Administrative Use Permit. Local rules are in Municipal Code Sections 40.26.450 to 40.26.460, which the City says it is updating for state law.

Enter your address to see a preliminary ADU fit for your lot.

ADU CALIFORNIA INC · CSLB #1163442

This online check is preliminary.

It isn't a permit decision, survey or engineering review; the city and project-specific engineering decide.

Local planning guide · Reviewed November 13, 2026

What matters for an ADU in Davis

Permitting authority: City of Davis Department of Community Development and Sustainability

Official local guidance

Local rules and design checks

Davis ADU requirements and application considerations
TopicLocal guidance
Code basisThe Guidelines cite Government Code Sections 66310 to 66342 and Davis Municipal Code Sections 40.26.450 to 40.26.460. The City notes that some Chapter 40 provisions may differ from current state law, which controls, and that it is updating the code on a rolling basis.
State Exempt ADUsA single-family lot may combine a conversion ADU within existing space, a JADU of up to 500 sq ft, and a detached ADU of up to 800 sq ft with 4-foot side and rear setbacks. Detached height is 16 feet, or 18 feet near major transit with 2 more feet for a matching roof pitch. Only a building permit is needed.
Ministerial ADUsUsed for attached additions and detached units over 800 sq ft. Attached units are limited to 50% of the home’s gross floor area; detached units to 850 sq ft for zero or one bedroom and 1,000 sq ft for two or more. Lot coverage, floor area ratio and open space apply, a detached unit must be 5 feet from the house, and a planning application comes before the building permit.
Design standardsMinisterial and Non-Ministerial ADUs must match the main home’s roof pitch within 2/12, with matching eaves, and use the same architectural style and details. Garage conversions outside the building-permit-only path must replace the garage door with matching walls, windows and trim, and street-facing changes on historic or conservation-district properties are not approved.
Non-Ministerial ADUsUnder Section 40.26.460, larger units of up to 1,200 sq ft and 30 feet need an Administrative Use Permit with notice to neighbors within 500 feet. Setbacks are the zone’s front yard, 15 feet street side, 5 feet interior side and 10 feet rear (5 feet on request), with 50% maximum lot coverage, 20% usable open space and privacy glazing on upper windows facing neighbors.
Parking, trees and sprinklersDavis requires no parking for ADUs or JADUs and no replacement of converted spaces, though bicycle parking may apply. A Tree Modification Permit from Urban Forestry is needed if construction may affect or remove a tree. Sprinklers are required only if the main home requires them.
Occupancy and rentalsADUs and JADUs must be rented for terms longer than 30 days. A JADU that shares a bathroom with the house requires owner occupancy and a recorded covenant barring separate sale and short-term rental; a JADU with its own sanitation facility does not need that covenant.

Selected local requirements, not a complete zoning determination.

Fees and budget checks

The Guidelines say ADUs under 750 sq ft are not charged impact fees, larger units pay impact fees proportional to the main home’s square footage, and the City prepares fee estimates from its Applicant Assumptions Form. A Non-Ministerial ADU’s Administrative Use Permit lists a $2,064 processing fee. Each ADU also needs its own address and adds dwelling-unit charges to the monthly city utility bill.

City of Davis ADU Guidelines (January 2026, PDF)

How to start the permit process

Use the Guidelines to pick the track, then email Planning at planning@cityofdavis.org or call 530-757-5610 (option 4) with questions. Ministerial and Non-Ministerial ADUs start with a planning application and conceptual plans before full construction drawings; building submittals go to the Building Division by email at OnlinePermits@cityofdavis.org with the forms it lists, plus an address request for the new unit.

Municipal pre-designed plan program

Davis’s free pre-designed ADU plans

The City offers free pre-designed plans for a 300 sq ft studio, a 565 sq ft one-bedroom and a 740 sq ft two-bedroom ADU, each in Adobe, Agrarian and Mid-Mod styles. Because they are already plan-checked, review is shorter and fees are reduced, but they cannot be modified, still need a site plan meeting 4-foot setbacks, and require a licensed general contractor before permit issuance.

View the original source

Davis ADU questions

Which Davis ADUs need only a building permit?
State Exempt ADUs: a conversion within existing space, a JADU of up to 500 sq ft, and a detached unit of up to 800 sq ft with 4-foot side and rear setbacks and a 16-foot height limit (18 feet near major transit). These skip a separate planning approval and neighborhood review, and lot coverage, floor area ratio and open space limits do not apply.
Can I build a two-story ADU in Davis?
Through the Non-Ministerial path, an ADU may reach 30 feet and 1,200 sq ft with an Administrative Use Permit, neighbor notice within 500 feet and a comment and appeal period. Upper-story windows facing neighboring lots need frosted or etched glass or privacy film. An attached ministerial ADU can also be a second story of the house within zone height and setbacks.
Does a Davis ADU need a parking space?
No. The City’s Guidelines say there are no parking requirements for ADUs or JADUs, and spaces removed or converted to create them need not be replaced. Depending on the total number of units on the lot, bicycle parking under Section 40.25A may be required.
How will an ADU change my Davis utility bill?
The City explains that four charges rise once the ADU receives final inspection: the Municipal Service Tax, the Public Safety Charge, sanitation and sewer, because each has a per-dwelling-unit component. Its cost handout walks through an example; check the City’s current utility rates for amounts.
Do I need a permit to work near trees for a Davis ADU?
If construction may affect a nearby tree or a tree will be removed, the Guidelines require a Tree Modification Permit from Urban Forestry under Municipal Code Chapter 37. Contact citytrees@cityofdavis.org early, because tree protection can change where the ADU fits on the lot.
Can I change a Davis pre-designed ADU plan?
No. The City does not accept changes to its pre-designed plans or field revisions during construction, and it may stop work if alterations are found. Once the building receives final approval, it can be modified under a separate building permit.

Sources for this guide

  • City of Davis — Accessory Dwelling Units and Guest Houses
  • City of Davis ADU Guidelines (January 2026, PDF)
  • Davis’s free pre-designed ADU plans
  • City of Davis — Building Division
  • City of Davis — Cost of an ADU and utility charges (PDF)
  • California HCD — ADU Handbook

Local sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.

Design-led ADU planning

ADU design, architecture & engineering coordination in Davis

Start with ADU design in Davis, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.

ADU Design Davis

Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.

ADU Architect Davis

Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.

ADU Engineer Davis

Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.

Custom ADU Builder Davis

Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.

ADU Contractor Davis

Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.

ADU Design Build Davis

A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

Junior ADU (JADU)

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references for common ADU sizes.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overviewADU building timelineADU property value

California directory

Explore more city guides.

View every California guide
  • SacramentoSacramento County
  • RosevillePlacer County
  • Fair OaksSacramento County
  • RocklinPlacer County

The next useful action

Put your address at the center of the conversation.

Enter your address to see a preliminary ADU fit for your lot.

Let’s build your ADU

Your property.
Your next chapter.

Explore the possibilities for your California property.

Check my property
Architectural concept of a modern California ADU in a landscaped garden, shown in natural daylight
Design concept

Let’s talk about your project.

(650) 400-7606info@adu.zone

ADU CALIFORNIA INC

San Jose office

84 W Santa Clara St, Suite 700
San Jose, CA 95113

Open 24/7

(650) 400-7606Get directions

Walnut Creek office

1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596

Open 24/7

(650) 400-7606Get directions
ADU CALIFORNIA INC
  • Facebook
  • Visit us on Industry Oversight
FAQCalifornia ADU costKnowledge Center
Legal & disclosuresPrivacyTerms of useAccessibility
CSLB #1163442

© 2026 ADU CALIFORNIA INC. All rights reserved.

San Jose · Walnut Creek · California