ADU Design Lafayette
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Contra Costa County · California

Lafayette splits responsibility: the City handles planning and zoning, while Contra Costa County handles the building permit. A complete project needs coordinated submissions to both agencies.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Local planning guide · Reviewed October 2, 2026
Permitting authority: City of Lafayette — ADU permit categories
Official local guidance| Topic | Local guidance |
|---|---|
| ADU classification | Lafayette identifies three ADU classes based on factors including construction type and whether the unit is attached. |
| Property records | The City’s building-permit guidance requires a title report prepared within the preceding six months for ADU applications. |
| Review order | Obtain the City’s zoning clearance before submitting stamped plans to County Building Inspection. |
Selected local requirements, not a complete zoning determination.
Lafayette advertises reduced ADU fees through 2026. Confirm eligibility and the applicable City amount, then budget County Building Inspection and any sanitary or fire charges separately; the City says other agencies maintain their own schedules.
Lafayette ADU fee-reduction informationEstablish the ADU class with City Planning, submit the title report and zoning package, then send City-stamped plans through Contra Costa County’s ePermits Center for building review.
Municipal permit example
The City’s PADU instructions explicitly preserve City zoning review before the County application, even for a preapproved design.
View the original sourceLocal sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
Design-led ADU planning
Start with ADU design in Lafayette, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.