Custom ADU Builder Atherton
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
San Mateo County · California

Atherton’s fee waivers make it especially important to separate Town charges from fire, water and sewer charges. The responsible utility district is part of the budget, even when a Town fee is waived.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Full-service ADU construction
Start with a custom ADU builder or ADU contractor in Atherton, then coordinate design, architecture, engineering, permits, budgeting, construction, inspections, and handoff around the property.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Local planning guide · Reviewed October 2, 2026
Permitting authority: Town of Atherton — ADUs
Official local guidance| Topic | Local guidance |
|---|---|
| JADU scale | The Town describes a JADU as no larger than 500 square feet within the qualifying home. |
| Accessory conversions | For an existing legal accessory building, establish the permitted footprint and applicable safety requirements before proposing a conversion. |
| Utility jurisdiction | The Town points owners to Menlo Fire, Cal Water and the applicable sanitary district for outside requirements. |
Selected local requirements, not a complete zoning determination.
Atherton says it waives several ADU permit fees, but outside-agency charges remain. Its page identifies Menlo Fire, Cal Water, Fair Oaks Sanitary and West Bay Sanitary, and notes that charges can include initial and recurring amounts.
Atherton fee-waiver and agency guidanceConfirm the ADU or conversion path with Town Planning and Building, then obtain the separate fire and utility requirements for the address. Record which agency charges are covered in each estimate.
Municipal program
The Town publishes a local fee-waiver explanation and an outside-agency list. The program does not establish a zero-cost permit package.
View the original sourceLocal sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.