Check my property
ADU CaliforniaSteel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.ContactReach the ADU California team.
(650) 400-7606Check my property
Home/Cities/San Carlos

San Mateo County · California

San Carlos ADU guide: local rules, permits & property planning

San Carlos combines a local plan gallery with property-specific checks for trees, sewer work and overlay districts. The gallery is free to browse, while permission to use a designer’s drawings can cost money.

Current, property-specific review controls the decision.

Online records can be incomplete or stale. Final setbacks, height, utilities, access, hazards, fees, schedule, and eligibility require current agency information and the appropriate licensed professionals.

Local planning guide · Reviewed October 2, 2026

What matters for an ADU in San Carlos

Permitting authority: City of San Carlos — Building an ADU

Official local guidance

Local rules and design checks

San Carlos ADU requirements and application considerations
TopicLocal guidance
Plan licensingObtain the designer’s permission before using a gallery plan.
Overlay districtsAsk Planning whether site or overlay standards require changes that affect the preapproved route.
Rental termThe City’s guidance prohibits rentals of fewer than 30 consecutive calendar days.

Selected local requirements, not a complete zoning determination. Confirm the current rules for your address with the responsible agency.

Fees and budget checks

The City distinguishes impact-fee exemptions for units under 750 square feet from utility connection and capacity charges. Use the FY2026–27 City fee schedule and request any tree-protection or sewer-related charges separately.

San Carlos FY2026–27 fees and cost of services

How to start the permit process

After obtaining plan-use permission, add site-specific information and submit directly to Building. Identify use of preapproved drawings in the application’s Description of Work.

Plan resource

San Carlos ADU Plans Gallery

The City links reviewed designs and designer contacts. Browsing access does not include a free license to build the design.

View the original source

San Carlos ADU questions

Are the gallery plans free to build from?
The gallery is free to browse; plan-use permission and pricing come from the designer.
Does an impact-fee exemption include water and sewer capacity?
The City expressly distinguishes utility connection and capacity charges from those impact fees.

Sources for this guide

  • City of San Carlos — Building an ADU
  • San Carlos FY2026–27 fees and cost of services

Local sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California to confirm project availability; this guide does not establish an office location or property approval.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces. They do not assert that a particular scope is permitted or suitable for your address.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references only. They are not a statement that a particular size is allowed or buildable at a San Carlos address.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overview

California directory

Explore more city guides.

View every California guide
  • BelmontSan Mateo County
  • Redwood CitySan Mateo County
  • Foster CitySan Mateo County
  • AthertonSan Mateo County

The next useful action

Put your address at the center of the conversation.

The online review is preliminary and is not a permit decision, survey, engineering opinion, construction document, final price, or guaranteed schedule.

Start with your property, then talk through the details.

Check my property
(650) 400-7606ADUcaliforniainc@gmail.comSan Jose office · ADU California Inc. / ADU.zone84 West Santa Clara Street Suite 730, San Jose, CA 95113, United States
Walnut Creek office1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596
(925) 744-5040