Campbell · Santa Clara County
Campbell gives ADU applicants two official paths, and they can be combined
Campbell is a small Santa Clara County city between San Jose, Los Gatos, and the Pruneyard, and it has published a single Accessory Dwelling Unit Bulletin, dated March 5, 2025, that splits ADU work into two official compliance paths and says those paths may be combined.
ADU California Inc., CSLB #1163442, designs and builds ADUs for Campbell properties as a service area. The published office is 84 W Santa Clara Street, Suite 700, San Jose, CA 95113, phone (650) 400-7606. This page is not a Campbell storefront, a permit, or a bid.
ADU California Inc. · CSLB #1163442 · (650) 400-7606. This is planning guidance. It is not legal advice, a permit decision, a survey, an engineering opinion, or a guaranteed price. Confirm current requirements with the city before design, budgeting, or construction.

Local standards and the by-right state path
The bulletin is the source for the standards below. Campbell’s zoning page also lists later interim ordinances, including an interim ADU/JADU ordinance and an interim SB 9 ordinance, so every figure should be reconfirmed with Planning before a submittal.
Section 3 of the bulletin describes a local development option that follows city standards under California Government Code sections 66314 to 66322, and a by-right option aligned with Government Code section 66323, which the City says is exempt from many of those local standards. State ADU law was re-numbered into those Government Code sections after Senate Bill 477.
On the local path, the bulletin’s summary table allows one ADU per lot — attached, detached, or conversion — on a single-family or multi-family property. On the by-right path, a single-family lot may have three ADUs: one conversion, one JADU, and one detached unit. A multi-family lot on the by-right path may have at least three, built from two to eight detached units (not more than the number of existing primary units) plus conversion of at least one unit and up to 25 percent of existing units. The bulletin says the two options may be combined.
Eligibility is the same for both paths. The parcel must be in a zone that permits residential or mixed-use development, including a Planned Development (P-D) district with a residential or mixed-use designation. It must already have a primary dwelling, or a building-permit application for one, when the ADU application is filed, and the ADU will not receive a certificate of occupancy before that primary unit. The parcel must have been legally established; the City Engineer may ask for a certificate of compliance. The City’s zoning map is published at the GIS link in the bulletin.
Size, setbacks, height, and Campbell’s one-living-room rule
Campbell writes a unit-composition rule that is easy to miss. An ADU must contain exactly one kitchen, no more than one living room (a habitable room of at least 120 square feet, as described by California Building Code Section 1208.1), and at least one bathroom. Floor area is living space only, measured to the inside perimeter of living-space walls. Garages and storage attached to a detached ADU are not counted in that maximum, but they must meet the property’s underlying standards; parking in those spaces still needs the 25-foot backup distance the bulletin describes.
Under the local development table, a detached ADU may be up to 1,200 square feet and 20 feet in height. An attached ADU is limited to 50 percent of the existing primary dwelling, except that a minimum living area of 1,000 square feet shall be permitted. Interior conversions have no maximum size in that table. Minimum living area is 150 square feet. Rear and interior or street-side setbacks are 4 feet, with a visibility-triangle exception at Section 21.18.060. Front setbacks follow the zone, except that an ADU of up to 800 square feet with 4-foot side and rear setbacks may encroach into the front setback when no other unimproved location on the lot is large enough.
Separation from the primary dwelling and from accessory structures is 10 feet if the ADU is in front of or behind the primary unit, and 5 feet if it is to the side — except that an ADU of 800 square feet or smaller with 4-foot side and rear setbacks is exempt from floor-area ratio, lot coverage, open space, and those separation standards.
Design standards in the bulletin apply to attached and converted ADUs, not to detached units. They include limits on rooftop terraces, balcony railings, and, in the Campbell Village Neighborhood Plan area, balconies that face adjoining R-1 lots. If the property is in a neighborhood plan area, read those plan rules with the bulletin, not instead of it. This page does not apply a neighborhood overlay to a specific parcel.
The by-right table in Section 7 uses an 800-square-foot cap for a new detached unit on a single-family lot, 4-foot side and rear setbacks, and a 20-foot height limit for those new detached units. Do not mix the local 1,200-square-foot cap with the by-right 800-square-foot cap without identifying which path the drawings follow.
Sprinklers, solar, historic lots, and short-term rentals
No parking is required for an ADU or a JADU, and parking removed to create the unit, including a converted garage, need not be replaced. Voluntary new parking must meet Chapter 21.28, including a paved driveway to a space outside required setbacks with a 25-foot backup distance. Leases shorter than 30 days are prohibited.
New detached ADUs are generally subject to the California Energy Code solar requirement; conversions and many additions are not. Fire sprinklers are required if the primary home has them, if the furthest corner of the ADU is more than 200 feet from the public street, or if an attached ADU is part of a remodel that the City treats as a “New House Using Portions of the Existing Structure.” That 200-foot trigger is a Campbell-specific check, not a generic statewide slogan.
On properties listed on the California Register of Historical Resources, only detached and interior ADUs are permitted. A detached unit must sit behind the primary dwelling, on the rear half of the lot, at a maximum of 18 feet and one story, and must maintain the appearance of the historic resource as the bulletin describes. Those historic rules supersede contrary provisions in the chapter.
Junior ADUs, including an attached garage
A JADU is limited to 500 square feet and, on Campbell’s bulletin, may be created entirely within an existing or proposed primary dwelling, including an existing attached garage. That garage language is more open than several neighboring cities’ JADU rules and should be confirmed for the specific house. The unit needs an efficiency kitchen, its own exterior entrance, and either its own bathroom or an interior entry to the main living area of the primary dwelling or a detached ADU. The owner must live in the JADU or the primary dwelling, and a deed restriction is required before the building permit is issued.
How Campbell takes the application
An ADU or JADU application does not require a land-use entitlement. It is submitted directly to the Building Division through MyGovernmentOnline (MGO). The bulletin points to the City’s Application Center and directs submittal questions to Building Inspection at (408) 866-2130 or building@campbellca.gov.
The bulletin also describes a state amnesty path for unpermitted ADUs built before January 1, 2020, if the structure has not been deemed substandard under Health and Safety Code Section 17920.3. Legalization is through a building permit, and a park in-lieu fee may still be due under Chapter 13.08; Public Works is listed at (408) 866-2150 for that fee. This page does not publish a dollar amount.
SB 9 is a different process
Campbell’s zoning-and-land-use page lists Interim Ordinance 26-2354, effective August 3, 2026, as an interim SB 9 / SB 450 / AB-1061 ordinance for single-family residential development and subdivisions, and Interim Ordinance 2322 as an interim SB 1211 ordinance for ADUs and JADUs. SB 9 is not an ADU permit. It is a separate two-unit and lot-split framework. Do not treat an ADU application as an SB 9 approval, or the reverse. Confirm with Planning which ordinance applies to the lot on the day of submittal, especially because several of these ordinances are interim and have published expiration dates.
ADU California Inc. can compare the local 1,200-square-foot path with the by-right 800-square-foot path, check the 200-foot sprinkler rule, and assemble the MGO submittal. Call (650) 400-7606. Reconfirm the March 5, 2025 bulletin with Planning before treating any number as final.
Reviewed November 17, 2026
Campbell ADU questions
- What are Campbell’s two ADU paths?
- The March 5, 2025 bulletin describes a local-standards path under Government Code sections 66314–66322, and a by-right path under section 66323. The City says they may be combined. Reconfirm with Planning, because later interim ordinances may change a number.
- How large can a Campbell ADU be?
- On the local path, the bulletin allows a detached ADU up to 1,200 square feet; an attached ADU is generally 50 percent of the primary dwelling, with a 1,000-square-foot minimum allowed. The by-right detached cap on a single-family lot is 800 square feet.
- Is parking required for a Campbell ADU?
- The bulletin says no, and that parking removed to create the ADU or JADU need not be replaced.
- Can a JADU be built in an attached garage?
- The March 5, 2025 bulletin says a JADU may be contained entirely within the primary dwelling, including an existing attached garage. Confirm that with Planning for the specific house.
- Do I need a planning entitlement?
- The bulletin says no. Submit a complete building-permit application through MyGovernmentOnline (MGO) to the Building Division.
- Is an ADU the same as an SB 9 unit?
- No. Campbell has a separate interim SB 9 ordinance for two-unit development and subdivisions. Ask Planning which process applies.
Planning resources
Sources for this guide
- City of Campbell — Accessory Dwelling Unit Bulletin (March 5, 2025)
- Campbell zoning and land use
- HCD Accessory Dwelling Units
Official city and state sources reviewed November 17, 2026. Figures on this page are attributed to those documents and are not a substitute for a property-specific determination. Reconfirm requirements with the city before submitting.
Nearby city guides
This guide is informational planning guidance, not legal advice. It does not establish an office in Campbell or approve a property. If a project uses steel framing, those construction benefits do not replace property verification, project-specific engineering, permitting, tested assemblies, or inspections.
Talk with ADU California Inc.
Check the Campbell address, then call.
ADU California Inc. · CSLB #1163442 · (650) 400-7606. The published office is 84 W Santa Clara St, Suite 700, San Jose, CA 95113. Campbell is a service area, not a local storefront. The property check is preliminary. It is not a permit, a survey, or a final price.