Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.FAQAnswers about cost, permits, licensing, and steel framing.ContactReach the ADU California Inc. team.
(650) 400-7606Check my property
(650) 400-7606
Home/Cities/Monterey

Monterey County · California

Monterey ADU design & construction

Illustrative daylight rendering of a backyard ADU. Not a photograph of a completed project in Monterey.

Monterey’s ADU rules are in City Code Section 38-112.6, and the first question is often water: an ADU or JADU is not permitted where water or sewer service is inadequate, and verification of water credits from the Monterey Peninsula Water Management District must accompany the building permit application. Complete ADU applications are approved ministerially through Building & Safety.

Enter your address to see a preliminary ADU fit for your lot.

ADU CALIFORNIA INC · CSLB #1163442

This online check is preliminary.

It isn't a permit decision, survey or engineering review; the city and project-specific engineering decide.

Local planning guide · Reviewed November 13, 2026

What matters for an ADU in Monterey

Permitting authority: City of Monterey Community Development Department

Official local guidance

Local rules and design checks

Monterey ADU requirements and application considerations
TopicLocal guidance
Code section and reviewSection 38-112.6 requires a building permit and ministerial approval or denial within 60 days of a complete application, without a hearing, unless the applicant requests a delay or the ADU accompanies a new home. A denial must list the deficiencies and how to fix them, and a detached garage can be demolished under the same approval.
Size and heightAttached or detached ADUs may have 850 sq ft for a studio or one bedroom and 1,000 sq ft with more bedrooms. Detached units are limited to 16 feet, or 18 feet within a half-mile walk of major transit (20 feet with an aligned roof pitch); attached units to 25 feet or the home’s limit, whichever is lower, and two stories.
R-3 second-story exceptionIn the R-3 zone, an ADU above a ground-level detached garage or carport may reach 25 feet through discretionary architectural review, with no windows within 4 feet of a property line and opaque windows parallel to a lot line within 10 feet. Architectural review can also approve an alternative roof pitch or form.
Setbacks and designNew ADUs need 4-foot side and rear setbacks; conversions need none beyond fire safety and may add up to 150 sq ft for access. Exterior materials must be identical in color, texture and appearance to the main dwelling, and the roof pitch and form must match, unless the Planning Commission approves an exception.
Water, sewer and utilitiesWater adequacy is determined by the Monterey Peninsula Water Management District, and the code cites the State Water Resources Control Board’s cease and desist order on local supplies. New ADUs need a separate sewer lateral unless a licensed plumber’s inspection shows the existing lateral meets City standards, separate electric and water submeters, and underground utility extensions.
Airport, historic and Mills Act parcelsADUs are prohibited in Airport Safety Zones 1 and 6 of the 2019 Monterey Airport Land Use Compatibility Plan, and four listed parcels need an avigation easement. On H-1 or H-2 parcels, ADUs sit behind the historic structure (detached units 10 feet behind) with a finish that does not match it, and Mills Act properties must follow their contract.
Parking, covenants and occupancyOne space per unit or bedroom, whichever is less, which may be tandem or in setbacks, is waived near transit or car share, inside existing structures, in historic districts or where on-street permits are not offered. A recorded covenant bars separate sale and rentals under 30 days. The code requires JADU owner occupancy; state law since 2026 ties that to shared sanitation, so confirm with the City.

Selected local requirements, not a complete zoning determination.

Fees and budget checks

Section 38-112.6 bars impact fees on ADUs under 750 sq ft and scales them for larger ADUs to the main dwelling’s size, not counting utility connection fees or capacity charges. Connection fees for a new ADU are proportionate to its burden on the system, while JADUs and conversions of existing space are exempt. Ask Building & Safety for current permit fees; this guide does not estimate Monterey costs.

Monterey City Code Section 38-112.6

How to start the permit process

Confirm the property’s water credits with the Monterey Peninsula Water Management District at (831) 658-5601 and prepare a preliminary site plan; Planning at (831) 646-3885 and Building & Safety at (831) 646-3890 can review the concept. Then submit the City’s building permit application with the MPWMD verification and the ADU and JADU Checklist, respond to plan review comments, and record the required covenant.

Municipal coastal planning record

Monterey’s coastal land use plans

The City lists coastal land use plans for Cannery Row, Del Monte Beach, Laguna Grande/Roberts Lake, Monterey Harbor and Skyline. State ADU law applies in the Coastal Zone but does not lessen Coastal Act protections (Government Code 66329), so a parcel in one of these areas should be checked with Planning for coastal permit needs before design.

View the original source

Monterey ADU questions

Why do Monterey ADUs need water credits?
Section 38-112.6 does not allow an ADU or JADU where water or sewer service is inadequate, and it cites the State Water Resources Control Board’s cease and desist order as showing existing supplies cannot meet added demand. Water credits or entitlements can offset that demand; MPWMD verifies them, and the verification is due with the building permit application.
Can I build an ADU over my garage in Monterey?
In the R-3 zone, an ADU above a ground-level detached garage or carport may exceed the normal detached height, up to 25 feet, through discretionary architectural review if the window limits near property lines are met. Elsewhere, detached ADUs are held to 16 feet, or 18 to 20 feet near major transit.
Does a Monterey ADU need parking?
Generally one space per unit or bedroom, whichever is less, which may be tandem on an existing driveway or in setback areas. It is waived within a half-mile walk of public transit, within one block of car share, inside existing structures, in a historic district, or where on-street permits are not offered. Garage spaces lost to an ADU need not be replaced.
Is an ADU allowed near the Monterey airport?
Not in Airport Safety Zones 1 and 6 of the 2019 Monterey Airport Land Use Compatibility Plan. Four parcels listed in the code by Assessor number must also grant an avigation easement to the Monterey Regional Airport District, or show they are outside the plan’s 65, 70 and 75 dB noise contours, before a permit is issued.
What about an ADU on a historic property in Monterey?
On parcels zoned H-1 or H-2, the code places attached ADUs at the rear of the historic structure and detached new units 10 feet behind it, calls for a finish that does not match the historic building, and keeps new ADU doors from facing the front yard, unless these rules would prevent the ADU. Mills Act properties must also follow their contract.
Can an unpermitted ADU be legalized in Monterey?
The City’s AB 2533 summary explains that for units built before January 1, 2020, it may not deny a legalization permit for building-standard noncompliance unless corrections are needed to address substandard conditions under Health and Safety Code 17920.3. The review focuses on health and safety, and a building permit is still required.

Sources for this guide

  • City of Monterey — ADUs and JADUs
  • Monterey City Code Section 38-112.6
  • Monterey’s coastal land use plans
  • Monterey — AB 2533 legalization pathway (PDF)
  • California Coastal Commission — ADU guidance memo (January 2022, PDF)
  • California HCD — ADU Handbook

Local sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.

Design-led ADU planning

ADU design, architecture & engineering coordination in Monterey

Start with ADU design in Monterey, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.

ADU Design Monterey

Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.

ADU Architect Monterey

Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.

ADU Engineer Monterey

Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.

Custom ADU Builder Monterey

Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.

ADU Contractor Monterey

Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.

ADU Design Build Monterey

A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

Junior ADU (JADU)

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references for common ADU sizes.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overviewADU building timelineADU property value

California directory

Explore more city guides.

View every California guide
  • Santa CruzSanta Cruz County
  • Morgan HillSanta Clara County
  • Los GatosSanta Clara County
  • Monte SerenoSanta Clara County

The next useful action

Put your address at the center of the conversation.

Enter your address to see a preliminary ADU fit for your lot.

Let’s build your ADU

Your property.
Your next chapter.

Explore the possibilities for your California property.

Check my property
Architectural concept of a modern California ADU in a landscaped garden, shown in natural daylight
Design concept

Let’s talk about your project.

(650) 400-7606info@adu.zone

ADU CALIFORNIA INC

San Jose office

84 W Santa Clara St, Suite 700
San Jose, CA 95113

Open 24/7

(650) 400-7606Get directions

Walnut Creek office

1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596

Open 24/7

(650) 400-7606Get directions
ADU CALIFORNIA INC
  • Facebook
  • Visit us on Industry Oversight
FAQCalifornia ADU costKnowledge Center
Legal & disclosuresPrivacyTerms of useAccessibility
CSLB #1163442

© 2026 ADU CALIFORNIA INC. All rights reserved.

San Jose · Walnut Creek · California