Custom ADU Builder Vallejo
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Solano County · California

Vallejo rewrote its ADU rules in 2026. Ordinance No. 1890 N.C.(2d), adopted September 8, 2026 and effective 30 days after final passage, repealed and replaced Municipal Code Chapter 16.303. The City’s March 2026 ADU Mini-Guide predates the new chapter, so where the two differ, such as owner occupancy and the zoning-review step, rely on the adopted chapter and confirm with the City.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Full-service ADU construction
Start with a custom ADU builder or ADU contractor in Vallejo, then coordinate design, architecture, engineering, permits, budgeting, construction, inspections, and handoff around the property.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Local planning guide · Reviewed November 13, 2026
Permitting authority: City of Vallejo Planning & Development Services
Official local guidance| Topic | Local guidance |
|---|---|
| Permit path | ADUs and JADUs need a building permit, and a compliant application is approved ministerially without a hearing. The Building Division decides completeness within 15 business days and routes a complete application to Planning; it must approve or deny within 60 days of receiving a complete application. |
| Unit combinations | A single-family lot may have one JADU, one attached or conversion ADU and one detached ADU, up to three units in total. Multifamily lots follow separate counts for conversion and detached ADUs. |
| Size | A detached ADU must be between 190 and 1,200 sq ft. An attached ADU starts at 190 sq ft, and its maximum is tied to 50% of the primary dwelling and to 850 sq ft for a studio or one bedroom or 1,000 sq ft for two or more; confirm how the City applies that limit to your floor plan. A JADU must be 190 to 500 sq ft. Conversions have no size limits. |
| Height | A detached ADU may be 16 feet, or 18 feet plus 2 feet for a roof pitch matching the main home when the lot is within a half mile of a major transit stop or high-quality transit corridor, and 18 feet on a multistory multifamily lot. An attached ADU may reach 25 feet or the zone’s height for the main home, whichever is lower. |
| Setbacks and larger-unit design | Attached and detached ADUs need 4-foot side and rear setbacks and the zone’s front setback; conversions and same-size rebuilds need none. New ADUs over 800 sq ft must match the main home’s materials, colors and roof slope, provide a 3-foot access path, screen mechanical equipment, keep exterior stairs 5 feet from side and rear lines and stay 5 feet from other structures. |
| Parking | One off-street space per ADU, which may be tandem on an existing driveway, unless the ADU is 500 sq ft or less, within a half-mile walk of public transit, in a historic district, inside the existing home or an accessory structure, where on-street permits are not offered to its occupant, or within one block of a car-share vehicle. Converted garage parking need not be replaced. |
| Owner occupancy, rentals and sale | Owner occupancy is not required for ADUs, and for a JADU only when it shares a bathroom with the main home. Rentals must be longer than 30 consecutive days, and an ADU or JADU cannot be sold separately except as state law allows. A JADU deed restriction is recorded with the Solano County Assessor/Recorder before occupancy. |
| Solar, sprinklers and site checks | A new detached ADU needs a solar photovoltaic system unless exempt under state codes, and sprinklers are required only when the main home must have them. The Mini-Guide notes a soils report is generally required for new construction and that flood or hazard requirements depend on elevation and location; ask Public Works early. |
Selected local requirements, not a complete zoning determination.
Chapter 16.303 applies the Master Fee Schedule review fees, and impact fees to newly built ADUs of 750 sq ft or more, charged in proportion to the primary dwelling. A conversion ADU or JADU is not treated as a new residential use for water and sewer connection or capacity charges unless it is built with a new single-family home. The Mini-Guide adds that service or meter upsizing may still be required.
Vallejo Ordinance No. 1890 N.C.(2d), Section 16.303.05Meet with Planning and Building staff, then submit the building permit application through eTRAKiT or in person at City Hall, 555 Santa Clara Street. The Mini-Guide says plan check is routed to Building, Planning, Public Works, Water and Fire Prevention, and to the Vallejo Flood and Wastewater District. Public Works assigns the ADU’s address during the permit process.
Municipal ordinance record
The Planning Commission recommended the ordinance in April 2026 and again in July 2026 after comments that included the Vallejo Flood and Wastewater District’s questions on utility connections. The City Council adopted it on September 8, 2026, and its state-law preemption section says state ADU law controls wherever the chapter conflicts with it.
View the original sourceLocal sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.