Check my property
ADU CaliforniaSteel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.ContactReach the ADU California team.
(650) 400-7606Check my property
Home/Cities/Burlingame

San Mateo County · California

Burlingame ADU guide: local rules, permits & property planning

Burlingame’s development guide brings Fire, Building, Parks and Engineering into the same project checklist. Garage slab waterproofing, protected trees and the actual fire-access route can all affect an otherwise compact ADU.

Current, property-specific review controls the decision.

Online records can be incomplete or stale. Final setbacks, height, utilities, access, hazards, fees, schedule, and eligibility require current agency information and the appropriate licensed professionals.

Local planning guide · Reviewed October 2, 2026

What matters for an ADU in Burlingame

Permitting authority: City of Burlingame — ADU Development Guide

Official local guidance

Local rules and design checks

Burlingame ADU requirements and application considerations
TopicLocal guidance
Fire accessThe guide measures a 150-foot access distance along a usable pedestrian route to the farthest part of the ADU, not a straight line through obstacles.
Garage conversionPlans must detail waterproofing over an existing slab-on-grade foundation.
Protected treesIdentify protected trees on and adjacent to the property; retained trees can require an arborist’s protection plan.

Selected local requirements, not a complete zoning determination. Confirm the current rules for your address with the responsible agency.

Fees and budget checks

Request the Building Division’s current assessment and identify any Parks, Engineering or fire review charges triggered by the site. Use the City’s ADU contact and application resource to obtain an itemized scope-specific estimate.

Burlingame ADU application contacts

How to start the permit process

Prepare coordinated drawings for the City’s four reviewing disciplines. Show the fire route, tree protection and drainage with the building plans, then resolve the separate agency comments through the building permit review.

Municipal design requirement

Burlingame garage-conversion detail

The City’s guide specifically requires a vapor-barrier detail and evaluation-report reference for slab waterproofing—a useful design check before pricing a garage conversion.

View the original source

Burlingame ADU questions

Can the fire-access measurement cross a pool or fence?
The City’s guide excludes routes through fences, pools, retaining walls and landscaping other than lawn.
Are neighboring trees relevant to my plans?
Yes. The guide includes protected trees on neighboring land that overhang the project property.

Sources for this guide

  • City of Burlingame — ADU Development Guide
  • Burlingame ADU application contacts

Local sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California to confirm project availability; this guide does not establish an office location or property approval.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces. They do not assert that a particular scope is permitted or suitable for your address.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references only. They are not a statement that a particular size is allowed or buildable at a Burlingame address.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overview

California directory

Explore more city guides.

View every California guide
  • HillsboroughSan Mateo County
  • San MateoSan Mateo County
  • Foster CitySan Mateo County
  • BelmontSan Mateo County

The next useful action

Put your address at the center of the conversation.

The online review is preliminary and is not a permit decision, survey, engineering opinion, construction document, final price, or guaranteed schedule.

Start with your property, then talk through the details.

Check my property
(650) 400-7606ADUcaliforniainc@gmail.comSan Jose office · ADU California Inc. / ADU.zone84 West Santa Clara Street Suite 730, San Jose, CA 95113, United States
Walnut Creek office1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596
(925) 744-5040