ADU Design San Bruno
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
San Mateo County · California

San Bruno’s ADU rules sit in Municipal Code Chapter 12.90, which the Planning Division posts as its ADU ordinance handout. ADUs are reviewed ministerially with the building permit, a deed restriction is recorded first, and lots under the San Francisco International Airport noise contours can face sound-insulation standards. Parts of the posted chapter predate later state law changes, so confirm current terms with a planner.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Local planning guide · Reviewed November 13, 2026
Permitting authority: City of San Bruno Community & Economic Development Department
Official local guidance| Topic | Local guidance |
|---|---|
| Code section and review | Chapter 12.90 makes ADUs a permitted use wherever residential uses are allowed and requires staff to process a complete building permit application ministerially within 60 days, without a hearing. A signed deed restriction is required before the building permit is issued. |
| Size by lot | On a single-family lot under 7,500 sq ft, an attached or detached ADU may have 850 sq ft for a studio or one bedroom and 1,000 sq ft with more bedrooms. On lots of 7,500 sq ft or more, a unit with more than one bedroom may reach 1,200 sq ft. A JADU is limited to 500 sq ft within the walls of the home. |
| Height, setbacks and second stories | A one-story ADU is limited to 16 feet with 4-foot side and rear setbacks. Two-story ADUs, including units over a legal detached garage, may reach 20 feet where the zone’s regular setbacks are met (16 feet for portions that are not), must satisfy the Residential Design Guidelines’ daylight plane or façade articulation rule, and keep stairs out of required parking. |
| Design and privacy | The ADU must match the main home’s architectural style, exterior materials, colors, roof pitch, window type and trim, and meet the objective Residential Design Guidelines. Balconies and stair landings may not face the nearest side or rear lot line, and windows within 5 feet of a property line need obscured glass, high placement or screening. |
| Parking | One space per ADU, which may be uncovered tandem parking in or next to the driveway, unless the unit is within a half mile of public transit, in a historic district, inside the existing home or an accessory structure, within one block of car share, or where on-street permits are not offered. Spaces lost to a garage conversion or demolition need not be replaced; the chapter says a JADU must replace parking it displaces. |
| Airport noise and flood checks | ADUs in the 65 CNEL or higher noise areas of the San Francisco International Airport land use compatibility plan must be built to Aircraft Noise Insulation Program standards. The City’s submittal checklist also asks whether the lot is in a flood zone; a new-construction ADU there needs an Elevation Certificate. |
| Deed restriction and occupancy | The recorded covenant bars separate sale and rentals under 30 days and records the size limits. The posted chapter also requires owner occupancy for ADU applications received after January 1, 2025 and for all JADUs, but state law now prohibits owner-occupancy rules for ADUs (Government Code 66315) and narrows them for JADUs, so ask Planning which terms its current deed restriction uses. |
Selected local requirements, not a complete zoning determination.
Chapter 12.90 waives impact fees for ADUs and JADUs under 750 sq ft unless built with a new home, scales impact fees on larger ADUs to the main home’s size, and exempts JADUs and conversions of existing space from new utility connections and capacity charges. The City’s submittal checklist shows how staff calculate the impact fee for larger ADUs; ask the department for the current amount for your plans.
San Bruno ADU submittal checklist (PDF)Call the Community & Economic Development Department at 650-616-7074 to schedule time with a planner, then complete the City’s ADU Submittal Checklist, which covers flood zone, easements, right-of-way encroachments, sprinklers and design-guideline conformance and accompanies the building permit submittal. The department’s permit applications are linked from sanbruno.ca.gov/sbpermits.
Municipal code provision
Chapter 12.90 lets the owner of an ADU built before the chapter took effect ask the Chief Building Official, before January 1, 2030, to delay enforcement of building-standard violations for five years. The official may grant it only after consulting the Fire Marshal and finding that correction is not needed to protect health and safety.
View the original sourceLocal sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
Design-led ADU planning
Start with ADU design in San Bruno, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.