Call
ADU California Inc. house iconADU California Inc.Steel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.FAQAnswers about cost, permits, licensing, and steel framing.ContactReach the ADU California Inc. team.
(650) 400-7606Check my property
(650) 400-7606
Home/Cities/South San Francisco

San Mateo County · California

South San Francisco ADU design & construction

Illustrative daylight rendering of a backyard ADU. Not a photograph of a completed project in South San Francisco.

South San Francisco regulates ADUs in Zoning Code Section 20.350.003 and asks for two applications: a building permit through the City’s Permitting Portal and a deed restriction checked by the Planning Division. Its April 2026 ADU handout spells out the standards, and the City’s HelloADU program offers residents free help with design, permitting and renting.

Enter your address to see a preliminary ADU fit for your lot.

ADU CALIFORNIA INC · CSLB #1163442

This online check is preliminary.

It isn't a permit decision, survey or engineering review; the city and project-specific engineering decide.

Full-service ADU construction

Custom ADU builder & contractor services in South San Francisco

Start with a custom ADU builder or ADU contractor in South San Francisco, then coordinate design, architecture, engineering, permits, budgeting, construction, inspections, and handoff around the property.

Custom ADU Builder South San Francisco

Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.

ADU Contractor South San Francisco

Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.

ADU Design Build South San Francisco

A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.

ADU Design South San Francisco

Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.

ADU Architect South San Francisco

Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.

ADU Engineer South San Francisco

Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.

Local planning guide · Reviewed November 13, 2026

What matters for an ADU in South San Francisco

Permitting authority: City of South San Francisco Economic & Community Development Department

Official local guidance

Local rules and design checks

South San Francisco ADU requirements and application considerations
TopicLocal guidance
Code section and reviewMunicipal Code Section 20.350.003 governs ADUs and JADUs. Applications go to the Building Division, and the Planning Division reviews them ministerially within 60 days after an application is deemed complete. Certain ADUs have zoning and development standards waived under Section 20.350.003(H).
Number of unitsA lot with an existing or proposed single-unit home may have one detached ADU, one converted or one attached ADU (not both), and one JADU. Lots with existing multi-unit buildings may add converted units in non-livable space (25% of existing units, or at least one) and up to eight detached ADUs, not exceeding the number of existing units.
SizeA detached ADU may have up to 1,000 sq ft of interior livable space. An attached ADU may have 50% of the main unit or 800 sq ft, whichever is greater, capped at 1,000 sq ft. Both may reach 800 sq ft even when lot coverage or floor area limits would otherwise be exceeded. A JADU is limited to 500 sq ft.
Height and setbacksAttached ADUs follow the zone’s height. Detached ADUs may be two stories up to 18 feet, or 20 feet where the roof pitch aligns with the main home and the site is within a half-mile walk of transit. New construction needs the zone’s front setback, 4-foot interior, street-side and rear setbacks, and 4 feet between structures, including eaves.
Design standardsAttached and detached ADUs must meet the site and design standards in Sections 20.310.002 and 20.310.003 on single-unit and duplex sites, or Section 20.310.004 on multifamily and mixed-use sites. Conversions of existing space are not subject to these height, setback and design rows.
ParkingOne space per ADU or per bedroom, whichever is less, and it can be tandem on a driveway. It is waived within a half-mile walk of transit, in a historic district, for conversions, when submitted with a new primary dwelling, where on-street permits are not offered, or within one block of car share. JADUs need no parking, and replacement parking is not required.
Occupancy, sale and rental limitsNo owner occupancy applies to ADUs. For a JADU that shares sanitation with the main home, the owner must live in the main home or the JADU. ADUs and JADUs cannot be sold separately or rented for less than 30 days, and a deed restriction acknowledging these terms is recorded for both.

Selected local requirements, not a complete zoning determination.

Fees and budget checks

The April 2026 handout says school fees on ADUs above a certain size are paid directly to the school district, building permit fees run roughly 10% of project valuation including plan check, sewer capacity charges and new utility connections apply only to ADUs built with a new primary dwelling, and most ADUs need a sewer video and an encroachment permit. Contact the Building Division for an estimate for your plans.

South San Francisco ADU handout (April 2026, PDF)

How to start the permit process

Confirm the site with Planning at planning@ssfca.gov or (650) 877-8535, then file the building permit on the Permitting Portal and the ADU or JADU deed restriction, checking it with Planning staff before notarizing. For new construction, the City asks applicants to contact PG&E early for preliminary clearance and to give the Fire Marshal a dimensioned drawing showing distances to the nearest fire access lane and hydrant.

Municipal homeowner assistance program

South San Francisco’s HelloADU program

The City’s HelloADU program, provided by the nonprofit Hello Housing, offers participating residents up to 100 hours of free help with feasibility, design, cost estimates, permits, construction and, for those who rent, landlord training. Participation is optional and does not change City review standards.

View the original source

South San Francisco ADU questions

What two applications does a South San Francisco ADU need?
A building permit application on the City’s Permitting Portal, which Planning reviews within 60 days once complete, and a deed restriction application. Deed restrictions are required for both ADUs and JADUs, with a separate form for JADUs that share sanitation facilities; the City asks you to check in with Planning staff before notarizing.
How tall can a detached ADU be in South San Francisco?
Up to 18 feet and two stories under the April 2026 handout. It may reach 20 feet when the roof pitch aligns with the main home and the site is within a half-mile walk of transit. Attached ADUs follow the zoning district’s height limit instead.
Can I use pre-approved ADU plans in South San Francisco?
The City accepts ADU plans for AB 1332 pre-approval and posts approved plans with the applicant’s contact information. A homeowner using one still submits site-specific materials on the Permitting Portal, and the City says it will approve or deny a complete application within 30 days. Ask whether a listed plan is valid under the current building code cycle.
Do I have to live on site to add an ADU in South San Francisco?
Not for an ADU. For a JADU that shares sanitation facilities with the main home, the owner must occupy the primary residence or the JADU; a JADU with its own sanitation carries no occupancy requirement. Either way, the unit cannot be sold separately or rented for less than 30 days.
What utility steps apply to a new ADU in South San Francisco?
The handout asks owners of new construction to contact PG&E early in design, because PG&E clearance is required when the building permit is submitted. Engineering requires a sewer video on most ADUs and an encroachment permit; sewer capacity charges and separate utility connections apply only when the ADU is built with a new primary dwelling.
Is there free help to plan an ADU in South San Francisco?
Yes. Through HelloADU, residents can receive up to 100 hours of free support with feasibility, design, cost estimating, permits, construction and renting. The City also points homeowners to the San Mateo County ADU Resource Center. These services help with planning but do not replace City review.

Sources for this guide

  • City of South San Francisco — Accessory Dwelling Units
  • South San Francisco ADU handout (April 2026, PDF)
  • South San Francisco Municipal Code Section 20.350.003, ADUs (eCode360)
  • South San Francisco Permitting Portal
  • South San Francisco ADU deed restriction steps (PDF)

Local sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

Junior ADU (JADU)

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references for common ADU sizes.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overviewADU building timelineADU property value

California directory

Explore more city guides.

View every California guide
  • San BrunoSan Mateo County
  • BurlingameSan Mateo County
  • Daly CitySan Mateo County
  • PacificaSan Mateo County

The next useful action

Put your address at the center of the conversation.

Enter your address to see a preliminary ADU fit for your lot.

Let’s build your ADU

Your property.
Your next chapter.

Explore the possibilities for your California property.

Check my property
Architectural concept of a modern California ADU in a landscaped garden, shown in natural daylight
Design concept

Let’s talk about your project.

(650) 400-7606info@adu.zone

ADU CALIFORNIA INC

San Jose office

84 W Santa Clara St, Suite 700
San Jose, CA 95113

Open 24/7

(650) 400-7606Get directions

Walnut Creek office

1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596

Open 24/7

(650) 400-7606Get directions
ADU CALIFORNIA INC
  • Facebook
  • Visit us on Industry Oversight
FAQCalifornia ADU costKnowledge Center
Legal & disclosuresPrivacyTerms of useAccessibility
CSLB #1163442

© 2026 ADU CALIFORNIA INC. All rights reserved.

San Jose · Walnut Creek · California