ADU Design Mill Valley
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
This community page is a short local note and is not offered as a standalone search result. For regional permitting context, use the North Bay ADU guide. Always verify current rules with the city or county; this is not legal advice.
Marin County · California

Mill Valley calls its detached-plan approval “structure only.” Foundation work, trees, fire safety and the usable area of a specific hillside lot remain part of the homeowner’s permit package.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Local planning guide · Reviewed October 2, 2026
Permitting authority: City of Mill Valley — ADUs
Official local guidance| Topic | Local guidance |
|---|---|
| Structure-only approval | Preapproval covers the detached building concept, not its placement or site works. |
| Site package | The City specifically identifies setbacks, foundation work, fire safety and tree removals as property-specific considerations. |
| Occupancy milestone | Outside-agency approvals, inspections and final sign-off remain necessary before occupancy. |
Selected local requirements, not a complete zoning determination.
Use Mill Valley’s July 1, 2026 Planning and Building schedules. Plan purchase, fire and sanitary review, site engineering and permit fees remain separate from structure preapproval.
Mill Valley current Planning and Building feesReview the buildable area, select a concept and contact its designer. Prepare the site-specific development-permit checklist, apply online, resolve conditions and obtain the building permit before construction.
Plan resource
The City publishes an eight-step homeowner process from concept selection to final inspection and rental planning, with site-specific work called out separately.
View the original sourceLocal sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
Design-led ADU planning
Start with ADU design in Mill Valley, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.