Check my property
ADU CaliforniaSteel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.ContactReach the ADU California team.
(650) 400-7606Check my property
Home/Cities/Tiburon

Marin County · California

Tiburon ADU guide: local rules, permits & property planning

Tiburon’s ADU checklist reaches beyond a building footprint: the exit route to the street, retaining walls and separate heating system must be shown. Those details are especially useful when comparing a conversion with new construction.

Current, property-specific review controls the decision.

Online records can be incomplete or stale. Final setbacks, height, utilities, access, hazards, fees, schedule, and eligibility require current agency information and the appropriate licensed professionals.

Local planning guide · Reviewed October 2, 2026

What matters for an ADU in Tiburon

Permitting authority: Town of Tiburon — residential ADU submittal requirements

Official local guidance

Local rules and design checks

Tiburon ADU requirements and application considerations
TopicLocal guidance
Street accessShow a separate exterior entrance and exit with a pathway to the street; detail new path construction, retaining walls and guardrails where needed.
HeatingThe checklist calls for a separate heating system and identification of existing ducts to be removed from the ADU.
Drawing scaleThe Town specifies scaled drawings on sheets at least 11 by 17 inches, with a fully dimensioned site plan.

Selected local requirements, not a complete zoning determination. Confirm the current rules for your address with the responsible agency.

Fees and budget checks

Tiburon’s Forms & Fees page lists a $595 flat Secondary Dwelling Unit permit charge. Confirm that line item’s applicability and add the separate building, engineering and outside-agency charges; $595 is not an all-in ADU permit total.

Tiburon Forms & Fees

How to start the permit process

Prepare the Town’s ADU-specific plan package, including structural and energy documents. Use the Town’s online permit resource to apply, track the application and pay assessed fees.

Municipal design requirement

Tiburon’s exit-path drawing requirement

The official checklist requires the path to the street and associated retaining or guardrail details. Include this work in a conversion estimate, not only the interior rooms.

View the original source

Tiburon ADU questions

Can I leave the path to the street off the plans?
No. Tiburon’s ADU checklist expressly requires it and details for a newly built path.
Is the $595 planning charge the entire project fee?
No. Ask the Town to identify all applicable building and agency charges for the proposal.

Sources for this guide

  • Town of Tiburon — residential ADU submittal requirements
  • Tiburon Forms & Fees
  • Tiburon forms and online permit portal

Local sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California to confirm project availability; this guide does not establish an office location or property approval.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces. They do not assert that a particular scope is permitted or suitable for your address.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references only. They are not a statement that a particular size is allowed or buildable at a Tiburon address.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overview

California directory

Explore more city guides.

View every California guide
  • Mill ValleyMarin County
  • San RafaelMarin County
  • NovatoMarin County
  • SonomaSonoma County

The next useful action

Put your address at the center of the conversation.

The online review is preliminary and is not a permit decision, survey, engineering opinion, construction document, final price, or guaranteed schedule.

Start with your property, then talk through the details.

Check my property
(650) 400-7606ADUcaliforniainc@gmail.comSan Jose office · ADU California Inc. / ADU.zone84 West Santa Clara Street Suite 730, San Jose, CA 95113, United States
Walnut Creek office1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596
(925) 744-5040