Marin County · California
Tiburon’s ADU checklist reaches beyond a building footprint: the exit route to the street, retaining walls and separate heating system must be shown. Those details are especially useful when comparing a conversion with new construction.
Local planning guide · Reviewed October 2, 2026
Permitting authority: Town of Tiburon — residential ADU submittal requirements
Official local guidance| Topic | Local guidance |
|---|---|
| Street access | Show a separate exterior entrance and exit with a pathway to the street; detail new path construction, retaining walls and guardrails where needed. |
| Heating | The checklist calls for a separate heating system and identification of existing ducts to be removed from the ADU. |
| Drawing scale | The Town specifies scaled drawings on sheets at least 11 by 17 inches, with a fully dimensioned site plan. |
Selected local requirements, not a complete zoning determination. Confirm the current rules for your address with the responsible agency.
Tiburon’s Forms & Fees page lists a $595 flat Secondary Dwelling Unit permit charge. Confirm that line item’s applicability and add the separate building, engineering and outside-agency charges; $595 is not an all-in ADU permit total.
Tiburon Forms & FeesPrepare the Town’s ADU-specific plan package, including structural and energy documents. Use the Town’s online permit resource to apply, track the application and pay assessed fees.
Municipal design requirement
The official checklist requires the path to the street and associated retaining or guardrail details. Include this work in a conversion estimate, not only the interior rooms.
View the original sourceLocal sources reviewed October 2, 2026. Historical examples retain their stated dates. Contact ADU California to confirm project availability; this guide does not establish an office location or property approval.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces. They do not assert that a particular scope is permitted or suitable for your address.
Compare planning footprints
These model pages are planning references only. They are not a statement that a particular size is allowed or buildable at a Tiburon address.
California directory
The next useful action
The online review is preliminary and is not a permit decision, survey, engineering opinion, construction document, final price, or guaranteed schedule.