ADU Design-Build Services
Design-build is the coordinated delivery path. One written agreement tracks the brief, the drawings, the permit follow-through, and the build. Building details stay on the construction pages. Application details stay on permit coordination.

Scope
The design-build scope is the handoff between those stages, not a second copy of them. ADU California Inc. keeps one list of what is included, what the city still has to decide, and what changed after a review comment.
Filing a complete application does not mean the city will approve it. Construction of the ADU waits until that permit is issued.
Catalog models
Names, sizes, and planning ranges come from the current catalog. A range is not a fixed price, and a model on this page does not mean the lot qualifies.
Site-specific requirements
- The address, the household brief, and the records already collected.
- A chosen unit type, or a feasibility note that the type is still open.
- The name of the city that will review the application, so the checklist is the right one.
Process steps
01
Align the brief
Record the address, the unit type, and the decisions still open before any drawing is treated as final.
02
Hold one scope
Write what design coordination, permit follow-through, and construction each include, and what they leave to the other service pages.
03
Track city comments in that scope
When the city asks for a change, update the same scope instead of starting a separate project.
04
Build only the issued set
Construction begins from the permit the city issued and the inclusions already written down.
Questions
- Is design-build the same as permit coordination?
- Permit coordination is the application and review work. Design-build also includes the construction agreement.
- Do I still need a separate feasibility check?
- A short feasibility pass is still useful. It tells you whether the unit type is worth drawing.
- Will one company be the contractor of record?
- When the construction agreement is with ADU California Inc., the license on that agreement is CSLB #1163442.
- Can I start construction before the permit is issued?
- No. Construction of the ADU waits for the permit the city requires.