Call
ADU California Inc. house iconADU California Inc.Steel-Framed Backyard Homes
ADU ModelsProcessServicesPortfolioFinancing
More
Backyard BuildingsStorage, workshop and garden concepts.Why SteelHow the framing and wall system work.Cost CalculatorBuild a preliminary project range.Regions & City GuidesExplore Northern California, Central Valley and Southern California.Knowledge CenterCosts, permits, models, systems and planning guides.FAQAnswers about cost, permits, licensing, and steel framing.ContactReach the ADU California Inc. team.
(650) 400-7606Check my property
(650) 400-7606
Home/Cities/Daly City

San Mateo County · California

Daly City ADU design & construction

Illustrative daylight rendering of a backyard ADU. Not a photograph of a completed project in Daly City.

Daly City’s Planning Division works from an Accessory Dwelling Unit Guide rather than a recently rewritten ordinance. The guide says that since January 1, 2020, conflicting parts of the Daly City Municipal Code are superseded by state law until the City adopts a local ordinance. On the ocean side of Skyline Boulevard, a detached ADU may also need a Coastal Development Permit.

Enter your address to see a preliminary ADU fit for your lot.

ADU CALIFORNIA INC · CSLB #1163442

This online check is preliminary.

It isn't a permit decision, survey or engineering review; the city and project-specific engineering decide.

Local planning guide · Reviewed November 13, 2026

What matters for an ADU in Daly City

Permitting authority: City of Daly City Economic & Community Development Department

Official local guidance

Local rules and design checks

Daly City ADU requirements and application considerations
TopicLocal guidance
Code basisThe City’s guide cites state ADU law and says it controls over conflicting Daly City Municipal Code provisions until a local ordinance is adopted, with the handout to be updated when that happens. Its checklist still calls for design review under Municipal Code Chapter 17.45 and compliance with building, fire and health codes.
How many unitsOn a lot with a single-family home, the guide allows no more than one attached or conversion ADU, one JADU and one detached ADU. On multi-family lots, ADUs inside non-living areas such as storage rooms or garages are limited to 25% of existing units (at least one), and up to two detached ADUs are allowed.
Attached ADUs and conversionsUp to 25 feet and two stories, and no more than 50% of the main home’s floor area or 850 sq ft (one bedroom or less) / 1,000 sq ft (more bedrooms), whichever is greater. Rear and side setbacks are 4 feet, with the zone’s front setback, lot coverage and height. A garage conversion needs an Engineering Division consultation about removing or reducing the curb cut.
Detached ADUsUp to 1,200 sq ft, with 4-foot rear and side setbacks and a height of 18 feet, or 20 feet when the roof pitch matches the main house. The City strongly recommends 6 feet of separation from the main home. A detached unit of 800 sq ft and 16 feet with 4-foot setbacks cannot be blocked by lot coverage, floor area or open-space limits.
Coastal ZoneThe guide places properties west of Skyline Boulevard, and west of Eastgate Drive north of John Daly Boulevard, in the Coastal Zone. There, ADUs within or attached to the main home and JADUs are typically exempt from a Coastal Development Permit, while a detached ADU may require one.
Entrances and walkwaysThe checklist asks for one exterior pedestrian entrance, not a sliding glass door, on the rear elevation or the same side as the main entrance unless that would trespass on a neighbor, plus a paved walkway from the public sidewalk or driveway to the ADU or JADU entrance.
Owner occupancy and rentalsThe guide says owner occupancy is not required for ADUs and applies to a JADU only when its bathroom is shared with the house; a shared-bath JADU needs evidence of owner occupancy and a recorded deed restriction under Municipal Code Section 17.40.110. ADUs and JADUs cannot be rented for 30 consecutive days or less.

Selected local requirements, not a complete zoning determination.

Fees and budget checks

The City’s ADU Guide does not publish ADU fees. Its building plan submittal checklist sends applicants to Engineering for stormwater requirements and to North County Fire for sprinkler questions, and says unpermitted work and open code enforcement cases must be resolved before new permits are issued. Ask the Building Division which fees apply; this guide does not estimate Daly City costs.

Daly City building plan submittal checklist, one- and two-family dwellings (PDF)

How to start the permit process

Before drawing plans, the City’s checklist suggests calling Planning at 650-991-8033 and asking for the planner of the day. Permits that involve plans are requested by emailing the Building Division a completed building permit application with PDF plans, as described on the City’s Permits Involving Plans page. The online Permit Portal handles quick permits, payments, records and inspection scheduling.

Municipal planning handout

Daly City’s guide flags superseded local rules

The ADU Guide posted on the City’s ADU page states that conflicting Daly City Municipal Code provisions are superseded by state law until the City adopts a local ordinance, and that the handout will be updated when one is adopted and as state law changes. Treat the guide and state law as the working reference, and confirm current standards with the Planning Division.

View the original source

Daly City ADU questions

Is my Daly City property in the Coastal Zone?
The City’s guide says properties west of Skyline Boulevard, and west of Eastgate Drive north of John Daly Boulevard, are in the Coastal Zone. There, a detached ADU may need a Coastal Development Permit, while ADUs inside or attached to the home and JADUs are typically exempt. Ask Planning to confirm your parcel before design.
How tall can a detached ADU be in Daly City?
18 feet, or up to 20 feet if the roof pitch matches the main house, according to the City’s guide. Attached ADUs and units within the home may reach 25 feet and two stories while meeting the zone’s setbacks and height rules. The City strongly recommends 6 feet between a detached ADU and the house.
Do I need fire sprinklers in a Daly City ADU?
The guide says sprinklers are not required in an ADU if they are not required in the main residence, but ADUs and JADUs must still meet building, fire and health codes, including fire flow testing. The building checklist directs sprinkler questions to North County Fire.
What does a Daly City JADU kitchen need?
An efficiency kitchen: a removable kitchen with a sink whose waste line is at most 1.5 inches, appliances on no more than 120 volts and no gas, and counter and cabinets of reasonable size. The guide caps the kitchen at six lineal feet, or eight feet when existing counter space is converted.
Can I convert my garage into an ADU in Daly City?
Garage conversions are allowed, but the project must still meet zoning rules such as trash and recycling storage and front-yard paving, and the Engineering Division must be consulted on whether the driveway curb cut has to be removed or reduced. Plan the frontage changes early, since they affect the site plan.
What if my Daly City property has unpermitted work?
The City’s building plan checklist says work done without permits must be brought into compliance, and open code enforcement cases closed, before new building permits are issued. Historical permit records can be reviewed at the building counter, and the checklist recommends checking the title report for easements before siting an ADU.

Sources for this guide

  • City of Daly City — Accessory Dwelling Units (ADUs)
  • Daly City building plan submittal checklist, one- and two-family dwellings (PDF)
  • Daly City’s guide flags superseded local rules
  • Daly City — Permits Involving Plans
  • Daly City — Permits and online Permit Portal
  • Daly City — Zoning (Title 17)

Local sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.

Design-led ADU planning

ADU design, architecture & engineering coordination in Daly City

Start with ADU design in Daly City, then coordinate architect and engineer scope, permitting, budgeting, and the custom builder or contractor work needed to move the project toward construction.

ADU Design Daly City

Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.

ADU Architect Daly City

Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.

ADU Engineer Daly City

Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.

Custom ADU Builder Daly City

Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.

ADU Contractor Daly City

Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.

ADU Design Build Daly City

A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.

A useful first review

Separate what is available from what still needs verification.

  1. 01

    Confirm the property

    Start with a complete address and review the available parcel, building, and map context.

  2. 02

    Identify the unknowns

    Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.

  3. 03

    Choose the next review

    Use the preliminary result to prepare a focused conversation with the required professionals and agencies.

Explore project types

Compare the scope before choosing a solution.

These pages explain the questions each project type introduces.

Detached ADU

Review planning questions

Garage Conversion

Review planning questions

Junior ADU (JADU)

Review planning questions

ADU Design and Permitting

Review planning questions

Compare planning footprints

See common ADU sizes before choosing a design.

These model pages are planning references for common ADU sizes.

600 sq ft · 1 bedroom

Compact one-bedroom planning footprint

View model guide

750 sq ft · 2 bedroom

Flexible two-bedroom planning footprint

View model guide

1,000 sq ft · 2 bedroom

Full-size two-bedroom planning footprint

View model guide

Keep planning moving

Related ADU planning resources

ADU cost calculatorFinancing overviewADU building timelineADU property value

California directory

Explore more city guides.

View every California guide
  • San BrunoSan Mateo County
  • South San FranciscoSan Mateo County
  • PacificaSan Mateo County
  • BurlingameSan Mateo County

The next useful action

Put your address at the center of the conversation.

Enter your address to see a preliminary ADU fit for your lot.

Let’s build your ADU

Your property.
Your next chapter.

Explore the possibilities for your California property.

Check my property
Architectural concept of a modern California ADU in a landscaped garden, shown in natural daylight
Design concept

Let’s talk about your project.

(650) 400-7606info@adu.zone

ADU CALIFORNIA INC

San Jose office

84 W Santa Clara St, Suite 700
San Jose, CA 95113

Open 24/7

(650) 400-7606Get directions

Walnut Creek office

1990 N California Blvd, 8th Floor
Walnut Creek, CA 94596

Open 24/7

(650) 400-7606Get directions
ADU CALIFORNIA INC
  • Facebook
  • Visit us on Industry Oversight
FAQCalifornia ADU costKnowledge Center
Legal & disclosuresPrivacyTerms of useAccessibility
CSLB #1163442

© 2026 ADU CALIFORNIA INC. All rights reserved.

San Jose · Walnut Creek · California