Custom ADU Builder Pacifica
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
San Mateo County · California

Pacifica’s ADU standards are in Article 4.5 of the Zoning Ordinance, which the California Coastal Commission certified as part of the City’s Local Coastal Program in 2021 with added coastal parking rules. Because much of western Pacifica lies in the Coastal Zone, many projects need an Administrative Coastal Development Permit before the building permit, and street width can cap how large an ADU may be.
Enter your address to see a preliminary ADU fit for your lot.
ADU CALIFORNIA INC · CSLB #1163442
Full-service ADU construction
Start with a custom ADU builder or ADU contractor in Pacifica, then coordinate design, architecture, engineering, permits, budgeting, construction, inspections, and handoff around the property.
Compare custom scope, site constraints, model options, finish level, construction sequence, and written pricing before selecting a build approach.
Coordinate construction scope, subcontractors, schedule, inspections, site logistics, and closeout around a clearly defined permitted set.
A coordinated design-build workflow keeps property review, design, engineering, permitting, budgeting, procurement, and construction aligned.
Develop the floor plan, exterior direction, material selections, functionality, and site fit before committing to engineering and construction.
Architectural planning can address layout, massing, code constraints, site relationships, and permit drawings where an appropriately licensed professional is required.
Engineering coordination can cover structural, foundation, utility, civil, energy, and other disciplines required by the property and permitting authority.
Local planning guide · Reviewed November 13, 2026
Permitting authority: City of Pacifica Planning Department
Official local guidance| Topic | Local guidance |
|---|---|
| Code section and where allowed | Article 4.5 of the Zoning Ordinance (Municipal Code Title 9, Chapter 4) allows ADUs on residentially zoned sites, and commercial sites where residential use is permitted, with an existing or proposed single-family home or an existing multi-family building. An ADU may even sit between the house and the front lot line. |
| Detached ADU size and setbacks | A detached ADU may have up to 1,200 sq ft with a 15-foot front setback and 4-foot side and rear setbacks. Above 800 sq ft it must stand 10 feet from other buildings, meets the zone’s lot coverage and landscaping rules, and is prohibited where any street frontage is unpaved or 26 feet wide or less. |
| Height | A detached ADU may be 25 feet or the main home’s height, whichever is less, but drops to 16 feet if the home is under 16 feet, if any part sits between the home and the front lot line, or if it is within 5 feet of a side, 10 feet of a street-side or 20 feet of the rear lot line. An ADU attached to the main home may reach 35 feet, subject to the same 16-foot triggers. |
| Attached ADUs | Studio or one-bedroom attached ADUs may be 850 sq ft or 50% of the main home, whichever is greater; two or more bedrooms, 1,000 sq ft or 50%. The front setback is 15 feet, or 20 feet above a garage, with 4-foot side and rear setbacks and the same street-width limit for units over 800 sq ft. |
| Coastal access parking area | Outside the mapped coastal access parking area, an ADU needs one space per unit or per bedroom, whichever is less, waived near transit, for conversions, for detached units of 800 sq ft or less and in other listed cases. Inside it, the certified rules require one off-street space per ADU, and those waivers do not apply. Studio ADUs need no parking in either area. |
| Rentals, sale and occupancy | ADUs may not be rented for less than 30 consecutive days or sold separately from the main home, and occupancy waits for a final inspection, a certificate of occupancy and a separate address. JADUs require the City’s recorded deed restriction under Section 9-4.454; ask Planning how current state rules on JADU owner occupancy apply. |
| Utility connections | An ADU inside the existing space of the home or an accessory structure needs no new utility connection or capacity charge unless it is built with a new home. Other ADUs may be required to install a new connection, with a fee or charge proportionate to the unit’s burden on the water or sewer system. |
Selected local requirements, not a complete zoning determination.
Article 4.5 limits connection fees or capacity charges for a new or separate utility connection to the ADU’s proportionate burden on the water or sewer system and exempts conversions within existing space, and state ADU law bars impact fees on units under 750 sq ft. Pacifica’s ADU page does not list permit fees; ask the Building Division for current amounts. This guide does not estimate Pacifica costs.
Coastal Commission exhibits for Pacifica’s ADU LCP amendment (2021, PDF)Check the City’s Coastal Zone Map, or ask the Planning Division at PlanningDivision@pacifica.gov or (650) 738-7341, to learn whether an Administrative Coastal Development Permit is needed before the building permit. Then submit the building permit through the Building Division’s online permit portal; a JADU also needs the City’s deed restriction form. Plans from the Pacifica ADU Plans Gallery can shorten building review to 30 days but still need site-specific planning.
State coastal review record
Reviewing Pacifica’s amendment LCP-2-PAC-20-0027-1 for its June 2021 hearing, Commission staff recommended approval with modifications to protect on-street public parking near the shoreline, including a mapped coastal access parking area where each ADU must provide one off-street space. The modifications also keep the Coastal Act in force, with ADU coastal permits handled administratively without a hearing.
View the original sourceLocal sources reviewed November 13, 2026. Historical examples retain their stated dates. Contact ADU California Inc. to confirm project availability; this guide does not establish an office location or property approval.
A useful first review
01
Start with a complete address and review the available parcel, building, and map context.
02
Keep missing setbacks, easements, utilities, access, hazards, and local requirements visible.
03
Use the preliminary result to prepare a focused conversation with the required professionals and agencies.
Explore project types
These pages explain the questions each project type introduces.
Compare planning footprints
These model pages are planning references for common ADU sizes.
Keep planning moving
California directory
The next useful action
Enter your address to see a preliminary ADU fit for your lot.